Optimization of private 5G network for robotization and automation of logistics operations through research and development of location-based services and dynamic quality control.
Public support
Provider
Technology Agency of the Czech Republic
Programme
—
Call for proposals
STA02023FW080
Main participants
Thein Digital s.r.o.
Contest type
VS - Public tender
Contract ID
FW08010065 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
Optimalizace privátní 5G sítě pro robotizaci a automatizaci logistických provozů pomocí výzkumu a vývoje lokalizačních služeb a dynamického řízení kvality.
Annotation in Czech
Cílem projektu je vytvořit komplexní systém privátní 5G sítě, podpůrných systémů a inovativní aplikace pro precizní lokalizaci 5G zařízení a dynamické řízení kvality sítě vedoucí k její optimalizaci. Tato technologie bude podporovat pokročilou automatizaci a robotizaci logistických provozů.
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
20203 - Telecommunications
OECD FORD - secondary branch
20204 - Robotics and automatic control
OECD FORD - another secondary branch
20205 - Automation and control systems
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
JD - Use of computers, robotics and its application<br>JW - Navigation, connection, detection and countermeasure
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The project was professionally handled at an appropriate level and focused on the current issues of private 5G networks, location services and dynamic network quality management. During the solution, activities were carried out including the design and integration of an experimental 5G infrastructure, verification of the UL-TDOA method, testing in laboratory and real environments and development of the Q-Guard software tool. At the same time, the recipient was faced with limited availability of commercial solutions supporting the UL-TDOA method. This situation was resolved by integrating the alternative ASOCS + HERMES + RAEMIS architecture, which enabled verification of the intended functionality in accordance with the project requirements and 3GPP standards, which can be considered an adequate response to market restrictions. The submitted documents show that the project materially achieved both planned results in the form of software and verified technology.
Solution timeline
Realization period - beginning
Jun 1, 2023
Realization period - end
Dec 31, 2025
Project status
U - Finished project
Latest support payment
Feb 28, 2025
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP26-TA0-FW-U
Data delivery date
Jun 12, 2026
Finance
Total approved costs
25,773 thou. CZK
Public financial support
10,228 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
15,601 thou. CZK