Increasing the efficiency of production processes using UWB location infrastructure
Project goals
The aim of the project is the design and development of an extension of the current positioning system for industrial applications, based on UWB (Ultra-Wideband) technology, by functionally enriched hardware of location tags and also a software superstructure for placing the positioning data generated by this system into new contexts, especially with regard to the mutual awareness of the tracked objects about themselves and their surroundings. This will enable innovative solutions capable of more accurately analysing, for example, work in progress (WiP) and downtime, thus making production and logistics processes more efficient. At the same time, the project's solution towards standardisation of OMLOX will enable interoperability between devices from different manufacturers based on UWB.
Keywords
Public support
Provider
Technology Agency of the Czech Republic
Programme
—
Call for proposals
STA02024FW010
Main participants
Sewio Networks s.r.o.
Contest type
VS - Public tender
Contract ID
FW10010203 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
Zvýšení efektivity výrobních procesů pomocí UWB lokalizační infrastruktury
Annotation in Czech
Cílem projektu je návrh a vývoj rozšíření současného pozičního systému pro průmyslové aplikace, založeného na technologii UWB (Ultra-Wideband), o funkčně obohacený hardware lokalizačních tagů a rovněž softwarovou nadstavbu pro uvádění pozičních dat generovaných tímto systémem do nových souvislostí, a to zejména s ohledem na vzájemné povědomí sledovaných objektů o sobě a svém okolí. To umožní přinést inovativní řešení, schopné precizněji analyzovat např. rozpracovanou výrobu (WiP, work in progress) a vznikající prostoje, a tím zefektivňovat výrobní i logistické procesy. Zároveň bude díky řešení projektu směrem k standardizaci OMLOX umožněna interoperabilita mezi zařízeními od různých výrobců na bázi UWB.
Scientific branches
R&D category
VV - Exeperimental development
OECD FORD - main branch
20201 - Electrical and electronic engineering
OECD FORD - secondary branch
20203 - Telecommunications
OECD FORD - another secondary branch
20202 - Communication engineering and systems
JA - Electronics and optoelectronics
JB - Sensors, detecting elements, measurement and regulation
JW - Navigation, connection, detection and countermeasure
Solution timeline
Realization period - beginning
Jan 1, 2024
Realization period - end
Jun 30, 2026
Project status
B - Running multi-year project
Latest support payment
Feb 28, 2024
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP25-TA0-FW-R
Data delivery date
Feb 20, 2025
Finance
Total approved costs
18,977 thou. CZK
Public financial support
13,283 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
5,693 thou. CZK
Basic information
Recognised costs
18 977 CZK thou.
Public support
13 283 CZK thou.
69%
Provider
Technology Agency of the Czech Republic
OECD FORD
Electrical and electronic engineering
Solution period
01. 01. 2024 - 30. 06. 2026