All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Sensor of rotational movement around vertical axis for seismic measurement

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    Standardní projekty 10 (SGA02007GA-ST)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    102/07/0794

Alternative language

  • Project name in Czech

    Snímač rotačního pohybu kolem svislé osy pro seismická měření

  • Annotation in Czech

    Studium rotačních složek pohybů vznikajících v zemské kůře patří mezi perspektivní přístupy v dnešní seismologii. Rotace mohou být pozorovány např. pomocí husté seismické sítě (micro-array, small aperture array) složené z klasických třísložkových seismografů. Přímé pozorování těchto pohybů pomocí přenosných přístrojů zatím není možné. Jediné pracoviště, které je schopné takovýchto pozorování, je tým prof. Igela z mnichovské univerzity. Jejich přístroj je však pevně vestavěn do budovy a je založenna laserovém interferometru.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JB - Sensors, detecting elements, measurement and regulation

  • CEP - secondary branch

    DC - Seismology, volcanology and Earth structure

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10507 - Volcanology<br>20201 - Electrical and electronic engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Within this project were developed prototypes of the seismic rotation motion based on the two principles and also a generator of rotational motion that can be used for seismic prospection.During the theoretical works and experiments we found that generat

Solution timeline

  • Realization period - beginning

    Jan 1, 2007

  • Realization period - end

    Dec 31, 2008

  • Project status

    U - Finished project

  • Latest support payment

    Apr 25, 2008

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP09-GA0-GA-U/02:2

  • Data delivery date

    Oct 22, 2009

Finance

  • Total approved costs

    798 thou. CZK

  • Public financial support

    798 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK