All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Theory of simultaneous transmission of heat,moisture and air through building construction

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    Standardní projekty 1 (SGA02002GA-ST)

  • Main participants

    Centrum stavebního inženýrství a.s.

  • Contest type

    VS - Public tender

  • Contract ID

Alternative language

  • Project name in Czech

    Teorie simultánního šíření tepla, vlhkosti a vzduchu stavebními konstrukcemi budov

  • Annotation in Czech

    Navrhnout a realizovat zařízení k měření simultanního šíření tepla vlhkosti a vzduchu v kapilárně-pórovitém prostředí stanovit fenomenologické koeficienty u nejdůležitějších stavebních a tepelně izolačních materiálů a stanovit prahové hodnoty pro řešenísimultanního šíření uvedených dějů (stanovit tedy hodnoty na jejichž základě lze rozhodnout ve kterých případech je možné řešit problémy šíření tepla vlhkosti a vzduchu bez jejich synergického efektu a ve kterých to není možné).

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JN - Civil engineering

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20101 - Civil engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Experimental facility was realised. During experimantal work was use materials: mineral wall (MW), expanded polystyrene (EPS) and plaster board (SDK). For measuring was choose boundary conditions: pressure air difference Dp = (10; 20; 30) Pa; temperature

Solution timeline

  • Realization period - beginning

    Jan 1, 2002

  • Realization period - end

    Jan 1, 2004

  • Project status

    U - Finished project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP/2005/GA0/GA05GA/U/N/B:7

  • Data delivery date

    Jun 2, 2008

Finance

  • Total approved costs

    606 thou. CZK

  • Public financial support

    606 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK