All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Simulation of processes with impacts to water quality in reservoir systém

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    Standardní projekty 2 (SGA02003GA-ST)

  • Main participants

    Ústav pro hydrodynamiku AV ČR, v. v. i.

  • Contest type

    VS - Public tender

  • Contract ID

Alternative language

  • Project name in Czech

    Simulace procesů s dopadem na kvalitu vody v soustavách nádrží

  • Annotation in Czech

    Cílem projektu je adaptace managementu vodohospodářské soustavy Lipno - Hněvkovice - Orlík - Slapy vůči variabilitě vnějších podmínek, stanovení optimálních způsobů využití soustavy a detekce limitů znečištění a prahových hodnot rozhodných veličin. Budoustanoveny významné procesy a veličiny v povodí soustavy nádrží a bude kvantifikován jejich vliv na kvalitu vody v jednotlivých nádržích soustavy. Kvalita vody v nádržích a říčních úsecích mezi nimi bude simulována pomocí dynamického 2-D modeluCE-QUAL-W2.Hydrologická data a údaje o kvalitě odtoku z povodí do koryta nebo nádrže budou na základě analýzy charakteristik dílčích povodí získána ze srážkoodtokového modelu. V rámci řešení projektu budou po optimalizaci modelu provedeny simulace na20-ti leté řadě reálných dat pro zjištění vlivu variability vnějších podmínek na soustavu nádrží, kromě toho budou provedeny simulace limitních situací jako postupu a retence extrémních průtoků, simulace ekologických havárií v povodí a scénářová studie

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    DA - Hydrology and limnology

  • CEP - secondary branch

    DJ - Pollution and water control

  • CEP - another secondary branch

    DO - Protection of landscape

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10501 - Hydrology<br>10502 - Oceanography<br>10503 - Water resources<br>10511 - Environmental sciences (social aspects to be 5.7)<br>10617 - Marine biology, freshwater biology, limnology

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project aims were achieved. The main result is optimized and calibrated 2-D mathematical model of hydrodynamics and water quality of the Vltava River reservoir. Collection of data was completed describing terrain morphology, reservoir bathymetry, hyd

Solution timeline

  • Realization period - beginning

    Jan 1, 2003

  • Realization period - end

    Jan 1, 2005

  • Project status

    U - Finished project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP06-GA0-GA-U/07:6

  • Data delivery date

    Jan 15, 2009

Finance

  • Total approved costs

    4,051 thou. CZK

  • Public financial support

    2,056 thou. CZK

  • Other public sources

    1,995 thou. CZK

  • Non public and foreign sources

    0 thou. CZK