All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Long term soil-structure interaction influenced by variation of ground water table

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    Standardní projekty 11 (SGA02008GA-ST)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    103/08/1119

Alternative language

  • Project name in Czech

    Dlouhodobá interakce stavby s podložím ovlivněná změnami hladiny podzemní vody

  • Annotation in Czech

    Zabýváme-li se otázkou dlouhodobé interakce vrchní stavby s podložím, musíme věnovat mimořádnoupozornost nevratným procesům jak ve vrchní stavbě, tak především v podloží. Nejvíce nevratných změn uvrchní stavby vznikne v průběhu výstavby vlivem hydratačních procesů a smršťování. Co se podloží týče,vznikají nejprve plastické deformace s přibývajícím zatížením. Zemina konsoliduje strukturu na maximálnízatížení vrchní stavbou. Tento stav je pak znatelně ovlivňován změnami hladiny podzemní vody v podzákladí.V důsledku sání se zvyšuje sedání vlivem plastických deformací. Potom, co do pórů začne vnikat vzduch, měníse stupeň nasycení a výrazně se zvětšuje efektivní napětí na skeletu zeminy. Naopak opětovné zavodnění můžezpůsobit zhroucení skeletu zeminy vlivemztráty sání a redistribuci napjatosti v podzákladí. Řešení výšepopsaného problému vyžaduje dlouhodobé sledování deformace základů či základových desek. Rovněžpodzákladí musí být věrohodně popsáno s použitím fyzikálně nelineárních modelů.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JM - Structural engineering

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20102 - Construction engineering, Municipal and structural engineering

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    In this project, all expected outcomes were satisfied. The irreversible and reversible deformation in subsoil due to changing of ground water level was theoretically described. The theoretical solution of the coupled moisture phenomena in saturated and unsaturated deforming porous media was used in a complex hydro mechanical model of subsoil. It was implemented in a new built FE computer code TRA

Solution timeline

  • Realization period - beginning

    Jan 1, 2008

  • Realization period - end

    Dec 31, 2010

  • Project status

    U - Finished project

  • Latest support payment

    Apr 16, 2010

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP11-GA0-GA-U/03:3

  • Data delivery date

    Feb 9, 2015

Finance

  • Total approved costs

    3,096 thou. CZK

  • Public financial support

    3,096 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK