Phytoextraction biomass disposal - an unsolved problem
Project goals
Potentially toxic metals such as Cd or Zn accumulated in the biomass of hyperacumulating and/or highly accumulating plants are bound into different parts of the organic matrix in different extent and direct extraction of these metals is not straightforward. The proposed aim of the project is to grow different plant species with the ability to accumulate metals in above ground biomass mainly willows and to develop procedure degrading organic matrix of the metal accumulating plants, into the forms, wheremetals could be effectively extracted and recovered for reuse as an raw materials or stabilized and safely deposited.
Keywords
compostingincinerationliquid extractionphytoextractiontoxic metals
Public support
Provider
Czech Science Foundation
Programme
Standard projects
Call for proposals
Standardní projekty 10 (SGA02007GA-ST)
Main participants
—
Contest type
VS - Public tender
Contract ID
104/07/0977
Alternative language
Project name in Czech
Odstraňování biomasy z fytoextrakce - neřešený problém
Annotation in Czech
Potenciálně toxické kovy jako Cd nebo zinek akumulované v biomase hyperakumulativních nebo vysoce akumulativních rostlin jsou vázány do různých částí organické matrice v různém rozsahu a přímá extrakce těchto kovů není snadná. Podstatou navrhovaného projektu je pěstování různých druhů rostlin schopných akumulovat kovy v biomase nadzemní části, hlavně vrby, a vyvinout proceduru degradace organické matrice biomasy obsahující kovy ve formách umožňujících efektivní extrakci kovů a následnou recyklaci, respektive stabilizaci a bezpečné uložení.
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
CI - Industrial chemistry and chemical engineering
CEP - secondary branch
DM - Solid waste and its control, recycling
CEP - another secondary branch
DK - Contamination and decontamination of soil including pesticides
10511 - Environmental sciences (social aspects to be 5.7)
20401 - Chemical engineering (plants, products)
20402 - Chemical process engineering
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
.
Solution timeline
Realization period - beginning
Jan 1, 2007
Realization period - end
Dec 31, 2009
Project status
U - Finished project
Latest support payment
Apr 22, 2009
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP10-GA0-GA-U/02:2
Data delivery date
Jan 22, 2015
Finance
Total approved costs
4,163 thou. CZK
Public financial support
4,163 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK
Recognised costs
4 163 CZK thou.
Public support
4 163 CZK thou.
0%
Provider
Czech Science Foundation
CEP
CI - Industrial chemistry and chemical engineering
Solution period
01. 01. 2007 - 31. 12. 2009