All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Development dynamics of the destruction and accumulation forming of rest pits after the opencast coal mining in Sokolov basin

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    Standardní projekty 1 (SGA02002GA-ST)

  • Main participants

    Výzkumný ústav pro hnědé uhlí a.s.

  • Contest type

    VS - Public tender

  • Contract ID

Alternative language

  • Project name in Czech

    Stanovení metodiky charakterizující dynamiku vývoje destrukčního a akumulačního tvarování zbytkových jam v Sokolovské pánvi

  • Annotation in Czech

    Cílem projektu je získání souboru dat s využitím penetračního měření ve vybraných kritických úsecích výstavby umělého jezera ve zbytkové jámě Medard-Libík. Na základě takto získaných podkladů by byla provedena predikce vodního díla na změny, kterými budeprocházet těleso výsypky po zavodnění.Úkol spadá do sféry tvorby následné krajiny po hornické činnosti, řešením navrácení funkce krajinného systému při zabezpečení stabilitní, ekologické a těsnící funkce sanačních zemních těles.Předpokládá se též vytvoření geografické databáze charakterizující stav vývoje destrukčního a akumulačního tvarování zbytkové jámy leteckým snímkováním tvorbou fotoortomap.Zvláště vyřešení stability svahů budoucího vodního díla bude determinovat využitelnost pro potřeby rekreace,zástavby a vývoj nové kvality životního prostředí. V případě, že by se přistoupilo k zavodnění zbytkové jámy lomu Medard-Libík bez úspěšného vyřešení výše naznačeného souboru problémů, tak s velkou pravděpodobností dojde k celé sérii

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    DH - Mining industry including coal mining and processing

  • CEP - secondary branch

    DA - Hydrology and limnology

  • CEP - another secondary branch

    DB - Geology and mineralogy

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10501 - Hydrology<br>10502 - Oceanography<br>10503 - Water resources<br>10504 - Mineralogy<br>10505 - Geology<br>10506 - Paleontology<br>10617 - Marine biology, freshwater biology, limnology<br>20701 - Environmental and geological engineering, geotechnics<br>20702 - Petroleum engineering (fuel, oils)<br>20703 - Mining and mineral processing

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The analysis results have been exercised during the monitoring system implementation in the course and after the residual pit filling with water according to the specific requirements of the water scheme control. A technical and security control (TSC) sh

Solution timeline

  • Realization period - beginning

    Jan 1, 2002

  • Realization period - end

    Jan 1, 2004

  • Project status

    U - Finished project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP/2005/GA0/GA05GA/U/N/B:7

  • Data delivery date

    Jun 2, 2008

Finance

  • Total approved costs

    2,487 thou. CZK

  • Public financial support

    2,487 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK