All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

measurement and analysis aerodynamic parameters of components and means of auxiliary ventilation for the calculation of ventilation project on PCs

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    Standardní projekty 2 (SGA02003GA-ST)

  • Main participants

    Vysoká škola báňská - Technická univerzita Ostrava / Hornicko-geologická fakulta

  • Contest type

    VS - Public tender

  • Contract ID

Alternative language

  • Project name in Czech

    Měření a zpracování aerodynamických parametrů komponent a prostředků separátního větrání pro výpočet projektu na PC

  • Annotation in Czech

    Stávající databáze aerodynamických parametrů všech prostředků a komponent separátního větrání je fyzicky i morálně zastaralá a neúplná. Podstatou navrhovaného projektu je její obnovení, zpřesnění a rozšíření. Moderní lutnové tahy jsou projektovány až doprůměru luten 2000 mm (ražení tunelů) délek 2000 m, a to se zařízením, jehož aerodynamické parametry nejsou dosud ověřeny. Získané výsledky budou zahrnuty do souboru údajů pro počítačové zpracování konkrétního návrhu separátního větrání.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    DH - Mining industry including coal mining and processing

  • CEP - secondary branch

    AQ - Safety and health protection, safety in operating machinery

  • CEP - another secondary branch

    BK - Liquid mechanics

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10305 - Fluids and plasma physics (including surface physics)<br>20701 - Environmental and geological engineering, geotechnics<br>20702 - Petroleum engineering (fuel, oils)<br>20703 - Mining and mineral processing<br>30305 - Occupational health

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The aim of the project No. 105/03/0589 was the completion of the database of the parameters of components for auxiliary ventilation for size range 800 as far as 2 000 mms, namely in selection pressure sources (ventilators, fans) and in the area of transm

Solution timeline

  • Realization period - beginning

    Jan 1, 2003

  • Realization period - end

    Jan 1, 2005

  • Project status

    U - Finished project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP06-GA0-GA-U/07:6

  • Data delivery date

    Jan 15, 2009

Finance

  • Total approved costs

    2,750 thou. CZK

  • Public financial support

    2,750 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK