All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Driving of collectors in areas affected with deep mine activities

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    Standardní projekty 8 (SGA02005GA-ST)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    105/05/2712

Alternative language

  • Project name in Czech

    Ražení kolektorů v oblastech dotčených hornickou činností

  • Annotation in Czech

    Podstatou navrhovaného projektu je návrh technologie ražení a vyztužování kolektorů v oblastech dotčených hornickou Činností. K technologii aplikované v tzv. standardním horninovém prostředí zde navíc nutno vyřešit otázky poklesů a zejména problematiku metanu - vystupujícího ze starých hornických děl během vlastního ražení i celé životnosti díla. Podstatou je tedy návrh vhodných technologií ražení, optimálních výztužních konstrukcí a úpravy horninového masivu tak, aby tyto projevy byly buď zcela nebo veznačné míře eliminovány. Teoretické návrhy budou ověřeny praktickými aplikacemi spolupracujících organizací, které se danou problematikou zabývají.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JM - Structural engineering

  • CEP - secondary branch

    JN - Civil engineering

  • CEP - another secondary branch

    DH - Mining industry including coal mining and processing

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20101 - Civil engineering<br>20102 - Construction engineering, Municipal and structural engineering<br>20701 - Environmental and geological engineering, geotechnics<br>20702 - Petroleum engineering (fuel, oils)<br>20703 - Mining and mineral processing

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    All aims that were determined in the project were realized. Project under discussion dealt with wholly specific problems that originate during driving of shallow workings in undermined regions with past and/or current mining activities. The most importan

Solution timeline

  • Realization period - beginning

    Jan 1, 2005

  • Realization period - end

    Dec 31, 2007

  • Project status

    U - Finished project

  • Latest support payment

    May 2, 2007

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP08-GA0-GA-U/04:3

  • Data delivery date

    Dec 16, 2008

Finance

  • Total approved costs

    2,700 thou. CZK

  • Public financial support

    2,700 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK