All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Interferometric determination of subsidences caused by undermining by permanent scatters and phase unwrapping correction within

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    Standardní projekty 11 (SGA02008GA-ST)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    205/08/0452

Alternative language

  • Project name in Czech

    Určování poklesů způsobených poddolováním pomocí trvalých odražečů a opravy fázového rozbalení v rámci interferometrických bloků

  • Annotation in Czech

    Cílem projektu je použít interferometrické zpracování v blocích pro určení poklesů v poddolované oblasti, kde je rovněž otevřená povrchová těžba. Tato oblast je zčásti pokrytá vegetací. Objekty zástavby jsou částečně umístěny na výsypkách. Tyto lokalityjsou obvykle koherentní, ale ne jejich okolí. V případě nespojitých koherencí nastává problém s rozbalením fáze. Proto je nutné následné zpracování, které bude vyžadovat opravit chyby v rozbalení fáze, a proto bude odvozena nová metoda pro rozbalení. V další části projektu bude testováno zpracování pomocí trvalých odražečů, zda je jich v dané oblasti dostatečné množství a jsou-li odhadnuté rychlosti dostatečně přesné (i když ne konstantní). Tato data budou porovnána s daty získanými z geodetického měření, jako je nivelace. Budou zkoumány metody odhadu postupu nelineárních deformací - data z klasických metod (geodetických) budou použita jako referenční model. V závěrečné fázi projektu budou porovnány obě interferometrické metody -

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    DH - Mining industry including coal mining and processing

  • CEP - secondary branch

    DE - Earth magnetism, geodesy, geography

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10508 - Physical geography<br>20701 - Environmental and geological engineering, geotechnics<br>20702 - Petroleum engineering (fuel, oils)<br>20703 - Mining and mineral processing<br>50701 - Cultural and economic geography

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Meeting the project goals: 1. Estimate the stability of the area with underground and surface mining activity -- The results show that there are deformations in the Ervěnice corridor. Deformations are not directly comparable to the results of the levelling survey because the levelling survey took place on the road and the radar signal is reflected by the road away from the satellite, theref

Solution timeline

  • Realization period - beginning

    Jan 1, 2008

  • Realization period - end

    Dec 31, 2010

  • Project status

    U - Finished project

  • Latest support payment

    Apr 16, 2010

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP11-GA0-GA-U/03:3

  • Data delivery date

    Feb 9, 2015

Finance

  • Total approved costs

    2,958 thou. CZK

  • Public financial support

    2,958 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK