Interferometric determination of subsidences caused by undermining by permanent scatters and phase unwrapping correction within
Project goals
The project goal is to use interferometric stack processing in the region affected by undermining combined with open-cast mining which is partly covered by vegetation for subsidence detection. Urban objects are built on the waste dump and these are suspected (or even known) to subside. They are usually coherent; however, their surroundings is usually not and if a discontinuity in the coherence appears, it may be a problem to perform the phase unwrapping reliably. Therefore, the postprocessing will alsorequire a method to correct the phase unwrapping errors and thus a new method for phase unwrapping will be developed.Another part of the project is the permanent scatters (PS) processing: investigation, if there are enough permanent scatters in the processed area, and if the estimated velocity is accurate enough (though probably not constant). The data will be compared with data obtained by classical techniques (such as leveling; where available). Methods for assessment of a non-linear deformation
Keywords
Public support
Provider
Czech Science Foundation
Programme
Standard projects
Call for proposals
Standardní projekty 11 (SGA02008GA-ST)
Main participants
—
Contest type
VS - Public tender
Contract ID
205/08/0452
Alternative language
Project name in Czech
Určování poklesů způsobených poddolováním pomocí trvalých odražečů a opravy fázového rozbalení v rámci interferometrických bloků
Annotation in Czech
Cílem projektu je použít interferometrické zpracování v blocích pro určení poklesů v poddolované oblasti, kde je rovněž otevřená povrchová těžba. Tato oblast je zčásti pokrytá vegetací. Objekty zástavby jsou částečně umístěny na výsypkách. Tyto lokalityjsou obvykle koherentní, ale ne jejich okolí. V případě nespojitých koherencí nastává problém s rozbalením fáze. Proto je nutné následné zpracování, které bude vyžadovat opravit chyby v rozbalení fáze, a proto bude odvozena nová metoda pro rozbalení. V další části projektu bude testováno zpracování pomocí trvalých odražečů, zda je jich v dané oblasti dostatečné množství a jsou-li odhadnuté rychlosti dostatečně přesné (i když ne konstantní). Tato data budou porovnána s daty získanými z geodetického měření, jako je nivelace. Budou zkoumány metody odhadu postupu nelineárních deformací - data z klasických metod (geodetických) budou použita jako referenční model. V závěrečné fázi projektu budou porovnány obě interferometrické metody -
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
DH - Mining industry including coal mining and processing
CEP - secondary branch
DE - Earth magnetism, geodesy, geography
CEP - another secondary branch
—
10508 - Physical geography
20701 - Environmental and geological engineering, geotechnics
20702 - Petroleum engineering (fuel, oils)
20703 - Mining and mineral processing
50701 - Cultural and economic geography
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Meeting the project goals: 1. Estimate the stability of the area with underground and surface mining activity -- The results show that there are deformations in the Ervěnice corridor. Deformations are not directly comparable to the results of the levelling survey because the levelling survey took place on the road and the radar signal is reflected by the road away from the satellite, theref
Solution timeline
Realization period - beginning
Jan 1, 2008
Realization period - end
Dec 31, 2010
Project status
U - Finished project
Latest support payment
Apr 16, 2010
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP11-GA0-GA-U/03:3
Data delivery date
Feb 9, 2015
Finance
Total approved costs
2,958 thou. CZK
Public financial support
2,958 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK
Recognised costs
2 958 CZK thou.
Public support
2 958 CZK thou.
0%
Provider
Czech Science Foundation
CEP
DH - Mining industry including coal mining and processing
Solution period
01. 01. 2008 - 31. 12. 2010