Interferometric determination of subsidences caused by undermining by permanent scatters and phase unwrapping correction within

Project goals

The project goal is to use interferometric stack processing in the region affected by undermining combined with open-cast mining which is partly covered by vegetation for subsidence detection. Urban objects are built on the waste dump and these are suspected (or even known) to subside. They are usually coherent; however, their surroundings is usually not and if a discontinuity in the coherence appears, it may be a problem to perform the phase unwrapping reliably. Therefore, the postprocessing will alsorequire a method to correct the phase unwrapping errors and thus a new method for phase unwrapping will be developed.Another part of the project is the permanent scatters (PS) processing: investigation, if there are enough permanent scatters in the processed area, and if the estimated velocity is accurate enough (though probably not constant). The data will be compared with data obtained by classical techniques (such as leveling; where available). Methods for assessment of a non-linear deformation

Keywords

inteferometrypermanent scattersubsidenceundermined area

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    Standardní projekty 11 (SGA02008GA-ST)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    205/08/0452

Alternative language

  • Project name in Czech

    Určování poklesů způsobených poddolováním pomocí trvalých odražečů a opravy fázového rozbalení v rámci interferometrických bloků

  • Annotation in Czech

    Cílem projektu je použít interferometrické zpracování v blocích pro určení poklesů v poddolované oblasti, kde je rovněž otevřená povrchová těžba. Tato oblast je zčásti pokrytá vegetací. Objekty zástavby jsou částečně umístěny na výsypkách. Tyto lokalityjsou obvykle koherentní, ale ne jejich okolí. V případě nespojitých koherencí nastává problém s rozbalením fáze. Proto je nutné následné zpracování, které bude vyžadovat opravit chyby v rozbalení fáze, a proto bude odvozena nová metoda pro rozbalení. V další části projektu bude testováno zpracování pomocí trvalých odražečů, zda je jich v dané oblasti dostatečné množství a jsou-li odhadnuté rychlosti dostatečně přesné (i když ne konstantní). Tato data budou porovnána s daty získanými z geodetického měření, jako je nivelace. Budou zkoumány metody odhadu postupu nelineárních deformací - data z klasických metod (geodetických) budou použita jako referenční model. V závěrečné fázi projektu budou porovnány obě interferometrické metody -

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    DH - Mining industry including coal mining and processing

  • CEP - secondary branch

    DE - Earth magnetism, geodesy, geography

  • CEP - another secondary branch

  • 10508 - Physical geography
    20701 - Environmental and geological engineering, geotechnics
    20702 - Petroleum engineering (fuel, oils)
    20703 - Mining and mineral processing
    50701 - Cultural and economic geography

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Meeting the project goals: 1. Estimate the stability of the area with underground and surface mining activity -- The results show that there are deformations in the Ervěnice corridor. Deformations are not directly comparable to the results of the levelling survey because the levelling survey took place on the road and the radar signal is reflected by the road away from the satellite, theref

Solution timeline

  • Realization period - beginning

    Jan 1, 2008

  • Realization period - end

    Dec 31, 2010

  • Project status

    U - Finished project

  • Latest support payment

    Apr 16, 2010

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP11-GA0-GA-U/03:3

  • Data delivery date

    Feb 9, 2015

Finance

  • Total approved costs

    2,958 thou. CZK

  • Public financial support

    2,958 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK

Recognised costs

2 958 CZK thou.

Public support

2 958 CZK thou.

0%


Provider

Czech Science Foundation

CEP

DH - Mining industry including coal mining and processing

Solution period

01. 01. 2008 - 31. 12. 2010