Developing novel hollow 1D nanostructures
Public support
Provider
Czech Science Foundation
Programme
Standard projects
Call for proposals
SGA0202600001
Main participants
Univerzita Pardubice / Fakulta chemicko-technologická
Contest type
VS - Public tender
Contract ID
26-23413S
Alternative language
Project name in Czech
Developing novel hollow 1D nanostructures
Annotation in Czech
One method of creating 1D nanostructures is to use a template that is coated with secondary materials by ALD and then removed. This approach allows the preparation of 1D nanostructures that cannot be prepared naturally. The project aims to develop hollow 1D nanostructured layers of selected materials deposited by ALD using 1D Te nanostructured templates, offering several advantages over commonly used patterns. Since Te removal is achieved by sublimation at about 300 °C in vacuum, in addition to the well-studied oxides (Al2O3 and TiO2), we will investigate TiAlC and metal coatings (Cu and Ni), which readily oxidize in air at high temperatures. Special attention will be paid to the variability of deposition temperatures, thickness limits and optimization of annealing temperatures for the production of free-standing and Te-free hollow 1D nanostructured layers. Our engineering of hollow 1D nanostructures will become a practical guide applicable to the fabrication of similar nanostructures of various compositions on large areas of any substrate, which can be utilized in many applications.
Scientific branches
R&D category
ZV - Basic research
OECD FORD - main branch
21001 - Nano-materials (production and properties)
OECD FORD - secondary branch
20501 - Materials engineering
OECD FORD - another secondary branch
—
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
JG - Metallurgy, metal materials<br>JJ - Other materials<br>JP - Industrial processes and processing
Solution timeline
Realization period - beginning
Jan 1, 2026
Realization period - end
Dec 31, 2028
Project status
Z - Beginning multi-year project
Latest support payment
—
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP26-GA0-GA-R
Data delivery date
May 6, 2026
Finance
Total approved costs
7,311 thou. CZK
Public financial support
7,311 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK