All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Novel concept of venturi loop reactors design. Method and fundamental data obtaining.

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Standard projects

  • Call for proposals

    Standardní projekty 14 (SGA02011GA-ST)

  • Main participants

    Vysoká škola chemicko-technologická v Praze / Fakulta chemicko-inženýrská

  • Contest type

    VS - Public tender

  • Contract ID

    P106-11-1865

Alternative language

  • Project name in Czech

    Nová koncenpce návrhu reaktorů s ejektorovým distributorem plynu. Metodika a získání základních dat.

  • Annotation in Czech

    Tématem našeho výzkumu je získávání teoretických a experimentálních dat pro navrhování kolon vybavených ejektorem pro distribuci plynu do kapaliny za účelem zvýšení rychlosti přestupu hmoty. Výhodou tohoto uspořádání je velmi vysoká rychlost absorpce v ejektoru ve srovnání se zbytkem zařízení. Stávající metody návrhu těchto zařízení jsou založeny na celkové rychlosti absorpce, a tedy ignorují rozdílné chování ejektoru a kolony. V tomto projektu je navrhován nový přístup založený na rozlišení chování dvou zmíněných částí. Tento přístup umožní eliminovat nejistotu při návrhu, která použitím zprůměrněných hodnot vzniká. Vysoké rychlosti přestupu hmoty však ztěžují získávání koeficientů přestupu hmoty, protože prozatím neexistuje spolehlivá metoda pro měření vysokých hodnot kLa (až 20 1/s). Tento projekt si klade za cíl: vytvoření požadované metody stanovení kLa, sledování vlivu viskozity vsádky a geometrie ejektoru a návrh korelací založených na odděleném modelování ejektoru a kolony.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    CI - Industrial chemistry and chemical engineering

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20401 - Chemical engineering (plants, products)<br>20402 - Chemical process engineering

Completed project evaluation

  • Provider evaluation

    O - Nesplněno zadání, smlouva však byla dodržena

  • Project results evaluation

    The starting period of the project was promising which can be documented by the only article published in 2012. Nontheless, since 2012 the solution of individual tasks started to lag behind the time schedule so that the most of them was not succesfully resolved until now. Despite the reasons provided by the head of team in his annual reports the project can be considered as missing a target.

Solution timeline

  • Realization period - beginning

    Jan 1, 2011

  • Realization period - end

    Dec 31, 2014

  • Project status

    S - Stopped (prematurely terminated) multi-year project

  • Latest support payment

    Jun 12, 2013

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP14-GA0-GA-U/01:1

  • Data delivery date

    Sep 30, 2017

Finance

  • Total approved costs

    1,977 thou. CZK

  • Public financial support

    1,977 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK