All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

An investigation of low-temperature plasma in systems of a planar magnetron, in systems with hollow cathodes and a microwave surfatron

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Post-graduate (doctorate) grants

  • Call for proposals

    Postdoktorandské granty 9 (SGA02009GA1PD)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    202/09/P159

Alternative language

  • Project name in Czech

    Výzkum parametrů nízkoteplotního plazmatu v systémech planárního magnetronu, systémů s dutými katodami a mikrovlnného surfatronu

  • Annotation in Czech

    Cílem projektu bude využití několika diagnostických metod plazmatu (Langmuirova sonda, kalorimetrická sonda, energetický analyzátor iontu, laserova absorpční spektroskopie, optická emisní spektroskopie) za účelem srovnávacího výzkumu vlastností technologických plazmatických depozičních systémů.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    BL - Plasma physics and discharge through gases

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10305 - Fluids and plasma physics (including surface physics)

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The project was excellent, both in terms of expertise and in terms of disbursement of funds.

Solution timeline

  • Realization period - beginning

    Jan 1, 2009

  • Realization period - end

    Dec 31, 2011

  • Project status

    U - Finished project

  • Latest support payment

    Apr 16, 2011

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP12-GA0-GP-U/03:3

  • Data delivery date

    May 2, 2016

Finance

  • Total approved costs

    719 thou. CZK

  • Public financial support

    719 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK