All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Penetration resistance - a progressive approach to evaluate the environment risk of harmful soil compaction

Project goals

At present, a penetration resistance is used only as a comparative and completive parameter assessing the harmful soil compaction by a vehicle running gear of heavy machinery on ground. Till now in scientific literature, however, wasn't described successful effort as to verification of this parameter to most significant indicator of soil profile damage - value of relative soil bulk density. The aim of this project is based on the way of verification the penetration resistance in dependence on soil physical parameters in homogeneous modeled profile of a defined soil type. The assessment of relationship between penetration resistance and soil dry bulk density, the original penetration method would be applied to a direct assessment of soil dry bulk density. Comparing both the conclusive results and specified critical values of soil properties, the index PRI (Penetration Resistance Index) would be determined to relate soil profile damage.

Keywords

penetrometrpenetrační odporpůdazhutnění půdyzemědělské pneumatiky

Public support

  • Provider

    Czech Science Foundation

  • Programme

    Post-graduate (doctorate) grants

  • Call for proposals

    Postdoktorandské granty 9 (SGA02009GA1PD)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    526/09/P452

Alternative language

  • Project name in Czech

    Penetrační odpor: progresivní směr v přímém hodnocení ekologického rizika škodlivého zhutnění půdy

  • Annotation in Czech

    Cíl projektu je stanovit v přesně definovaných půdních podmínkách průběh suché objemové hmotnosti zeminy penetračním odporem zeminy. Vyjádřit míru poškození homogenního půdního profilu penetračním indexem PRI s ohledem na limitní hodnoty půdních fyzikálních vlastností definovaného půdního druhu.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    DF - Pedology

  • CEP - secondary branch

    DB - Geology and mineralogy

  • CEP - another secondary branch

    GB - Agricultural machines and construction

  • 10504 - Mineralogy
    10505 - Geology
    10506 - Paleontology
    20102 - Construction engineering, Municipal and structural engineering
    20302 - Applied mechanics
    40104 - Soil science

Completed project evaluation

  • Provider evaluation

    O - Nesplněno zadání, smlouva však byla dodržena

  • Project results evaluation

    Solver has not complied with the award, agreement, however, was observed.

Solution timeline

  • Realization period - beginning

    Jan 1, 2009

  • Realization period - end

    Dec 31, 2011

  • Project status

    U - Finished project

  • Latest support payment

    Apr 16, 2011

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP12-GA0-GP-U/03:3

  • Data delivery date

    May 2, 2016

Finance

  • Total approved costs

    798 thou. CZK

  • Public financial support

    798 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK