All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
LD15131

Fatigue behaviour of FRP reinforced steel members under severe environment

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    COST CZ

  • Call for proposals

    COST CZ 5 (SMSM2015LD5)

  • Main participants

    České vysoké učení technické v Praze / Fakulta stavební

  • Contest type

    VS - Public tender

  • Contract ID

    MSMT-33315/2015-1

Alternative language

  • Project name in Czech

    Chování ocelových konstrukcí zesílených FRP při náročných účincích prostředí

  • Annotation in Czech

    Projekt je zaměřen na zesilování ocelových mostů, které vykazují poškození vlivem únavy, pomocí uhlíkových lamel. Cílem výzkumu je nalézt optimální metodu aplikace lamel na konstrukci tak, aby došlo ke zvýšení únavové životnosti ocelové konstrukce a zároveň analyzovat chování tohoto zesílení v závislosti na degradaci vlivem povětrnostních vlivů, zatížením od provozu na mostě a stavebním pracím. Současně pak stanovit vliv okolního prostředí na chování lamely. Dále bude analyzováno chování na kontaktu sezesilovaným prvkem a chování FRP při jeho porušování. Uvedené činnosti budou podpořeny experimentální činností a numerickým modelováním.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JN - Civil engineering

  • CEP - secondary branch

    JI - Composite materials

  • CEP - another secondary branch

    JL - Fatigue and fracture mechanics

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20101 - Civil engineering<br>20306 - Audio engineering, reliability analysis<br>20505 - Composites (including laminates, reinforced plastics, cermets, combined natural and synthetic fibre fabrics; filled composites)

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    "The first year of the project was focused on the throughout analysis of the existing methods of the reinforcing of deteriorated bridges and also on the impact of weather and other conditions on the reinforcing methods. Extensive report was created and submitted. The second year was focused on the fatigue tests on the steel and CFRP strengthened samples. The deterioration was analysed and tested as well. The results proved significant increase in the fatigue resistance. They were also published in the journals and important international conferences. "

Solution timeline

  • Realization period - beginning

    Oct 22, 2015

  • Realization period - end

    Dec 31, 2016

  • Project status

    U - Finished project

  • Latest support payment

    Mar 1, 2016

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP17-MSM-LD-U/01:1

  • Data delivery date

    Jun 23, 2017

Finance

  • Total approved costs

    794 thou. CZK

  • Public financial support

    794 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK