All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
LH11098

Study of Power Electronic Converters and their Control Strategy for Active Filters

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT II

  • Call for proposals

    KONTAKT II 1 (SMSM2011LH1)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    6970/2011-320

Alternative language

  • Project name in Czech

    Studie měničů výkonové elektroniky a strategie jejich řízení

  • Annotation in Czech

    - vytvoření mezinárodního řešitelského týmu, - analýza funkce dvou dohodnutých zapojení víceúrovňových výkonových měniče pro aplikaci jako aktivní filtr, - vytvoření simulačních modelů a jejich ověření výpočty provozních stavů

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JA - Electronics and optoelectronics

  • CEP - secondary branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - another secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    In the project "Study on Power Electronics Converter and Its Control Strategy" from program KONTAKT II the research team was grounded. Its members are research workers from CTU in Prague, FEE (CZ) and from BTU Beijing (PRC). Both sides analyzed and verified by simulations the circuit of the active filter with the multilevel inverter. Selected results were presented on international conferences.

Solution timeline

  • Realization period - beginning

    Mar 1, 2011

  • Realization period - end

    Dec 31, 2012

  • Project status

    U - Finished project

  • Latest support payment

    Feb 15, 2012

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP13-MSM-LH-U/01:1

  • Data delivery date

    Jun 28, 2013

Finance

  • Total approved costs

    500 thou. CZK

  • Public financial support

    500 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK