All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
LH13283

Research of the Terawatt Z-pinch Plasmas

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT II

  • Call for proposals

    KONTAKT II 3 (SMSM2013LH3)

  • Main participants

    České vysoké učení technické v Praze / Fakulta elektrotechnická

  • Contest type

    VS - Public tender

  • Contract ID

    MSMT-16744/2013

Alternative language

  • Project name in Czech

    Výzkum plazmatu terawatových z-pinčů

  • Annotation in Czech

    Získání nových poznatků o efektivní produkci energetických částic ve výkonných silnoproudých energetických výbojích se zaměřením na optimalizaci zdroje fúzních neutronů pro využití v bezpečné jaderné energetice.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    BL - Plasma physics and discharge through gases

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10305 - Fluids and plasma physics (including surface physics)

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    During the experiments on the GIT-12 facility, the optimized conditions for the high neutron yield 1013 and generation of protons, deuterons and neutrons with energies up to 10-30 MeV were obtained. The results will be used for collaboration with laboratories in USA. The new diagnostics for determination of energy and locality of high energy particle generation were tested and used. 3 bachelor, 2diploma and 5 doctoral works were part of the project solution.

Solution timeline

  • Realization period - beginning

    Mar 15, 2013

  • Realization period - end

    Dec 31, 2015

  • Project status

    U - Finished project

  • Latest support payment

    Feb 27, 2015

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP16-MSM-LH-U/01:1

  • Data delivery date

    Oct 9, 2017

Finance

  • Total approved costs

    1,861 thou. CZK

  • Public financial support

    1,861 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK