All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
ME 033

Selection of the Optimum Metallic Materials for Severe Working Condition in Waste Incineration Plants

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

  • Main participants

    SVÚM PRAHA a.s.

  • Contest type

  • Contract ID

Alternative language

  • Project name in Czech

    Výběr optimálních kovových materiálů pro náročné provozní podmínky ve spalovnách odpadků.

  • Annotation in Czech

    Věroba elektrick, energie ve spalovn ch odpad. pýedpokl d vycc˙ parametry p ry.Zvěcen teplota a agres˙vn˙ atmosf,ra s obsahem HCl a SO2 jsou pý˙zinou toho, §e dominantn˙m faktorem pro §ivotnost pýedevc˙m pýehý˙v k. p ry je vysokoteplotn˙ koroze. VěbŘr vhodněch materi l. je velmi obt˙§ně , proto§e kromŘ korozn˙ odolnosti mus˙ splĺovat i podm˙nky technologick,-tvaýitelnost, svaýitelnost,obrobitelnost ap. Nav˙c slo§en˙ odpad. v r.zněch zem˙ Evropy a t˙m i slo§en˙ vzniklěch spalin se navz jem lic˙. Proto jenutno v laboratoýi a pozdŘji pý˙mo v provoze vybran, oceli a slitiny odzkoucet.

Scientific branches

  • R&D category

  • CEP classification - main branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - secondary branch

    JK - Corrosion and material surfaces

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20506 - Coating and films<br>20704 - Energy and fuels

Solution timeline

  • Realization period - beginning

    Jan 1, 1996

  • Realization period - end

    Jan 1, 1998

  • Project status

    K - Ending multi-year project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP/1998/MSM/MSM8ME/V/1:2

  • Data delivery date

Finance

  • Total approved costs

    675 thou. CZK

  • Public financial support

    95 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK