All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
ME 708

Development of sithing technologies(czech name:zápustkové)and their application during creation of accurate product.

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

    KONTAKT 3 (SMSM200300003)

  • Main participants

    Vysoké učení technické v Brně / Fakulta strojního inženýrství

  • Contest type

    VS - Public tender

  • Contract ID

Alternative language

  • Project name in Czech

    Rozvoj technologií zápustkového kování a jejich aplikace při výrobě přesných výkovků

  • Annotation in Czech

    Cílem projektu je sledování životnosti kovacích zápustek a nalezení metod ke zvýšení životnosti včetně průmyslového ověření. Budou vypracovány soubory kovaných součástí, charakterizujících zásadytechnologičnosti kovaných součástí. Cílem projektu je rovněž predikce vzniku technologických vad, jejich teoretický rozbor na základě počítačové simulace, ověření na experimentu a odzkoušení v technické praxi.

Scientific branches

  • R&D category

    NV - Nonindustrial research (Applied research excluded Industrial research)

  • CEP classification - main branch

    JG - Metallurgy, metal materials

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20501 - Materials engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    On basis of former contacts narow cooperation with research institute BRIMET Peking was established, after mutual exchange of reesearchrs possibilities of both sides were aassesed and agreement for further period signed

Solution timeline

  • Realization period - beginning

    Jan 1, 2003

  • Realization period - end

    Jan 1, 2004

  • Project status

    U - Finished project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP/2005/MSM/MSM5ME/U/N/4:2

  • Data delivery date

    Jun 2, 2008

Finance

  • Total approved costs

    765 thou. CZK

  • Public financial support

    438 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    327 thou. CZK