Investigation on the performance and defect characterization in the advanced scintillator materials
Public support
Provider
Ministry of Education, Youth and Sports
Programme
KONTAKT
Call for proposals
KONTAKT 6 (SMSM2008ME3)
Main participants
—
Contest type
VS - Public tender
Contract ID
2783/2009-32
Alternative language
Project name in Czech
Moderní anorganické scintilátory. Užitné charakteristiky a vliv materiálových defektů
Annotation in Czech
Připravit a charakterizovat vzorky monokrystalických scintilátorů na bázi komplexních oxidů. Popsat procesy přenosu a záchytu energie a roli defektů v nich. Navrhnout a realizovat technologické modifikace pro materiálovou optimalizaci
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
BM - Solid-state physics and magnetism
CEP - secondary branch
JB - Sensors, detecting elements, measurement and regulation
CEP - another secondary branch
JJ - Other materials
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10302 - Condensed matter physics (including formerly solid state physics, supercond.)<br>20201 - Electrical and electronic engineering<br>20502 - Paper and wood<br>20503 - Textiles; including synthetic dyes, colours, fibres (nanoscale materials to be 2.10; biomaterials to be 2.9)<br>21001 - Nano-materials (production and properties)<br>21002 - Nano-processes (applications on nano-scale); (biomaterials to be 2.9)
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Single crystal scintillators based on silicates, AI perovskites and LaBr3 and LuAG:Pr optical ceramics were prepared in Chinese laboratories and characterized at the Czech side. Their figure-of-merit was evaluated. Results are useful for Czech industry.
Solution timeline
Realization period - beginning
Jan 1, 2008
Realization period - end
Dec 31, 2009
Project status
U - Finished project
Latest support payment
Feb 24, 2009
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP10-MSM-ME-U/01:1
Data delivery date
Jun 30, 2010
Finance
Total approved costs
2,026 thou. CZK
Public financial support
1,450 thou. CZK
Other public sources
576 thou. CZK
Non public and foreign sources
0 thou. CZK