Analysis of influences of electrical traction into electrical network.
Public support
Provider
Ministry of Education, Youth and Sports
Programme
KONTAKT
Call for proposals
KONTAKT 6 (SMSM2008ME3)
Main participants
—
Contest type
VS - Public tender
Contract ID
1323/2010-32
Alternative language
Project name in Czech
Analýza vlivů elektrické vozby na napájecí energetickou soustavu
Annotation in Czech
- Nabídka inovačních výsledků odp. pracovníkům zainteresovaných realizačních organizací - společné odb. publikace v ČR a RF - účast na ELEKTROTECHNIKA, SEKEL a INOVACE 2009 (09, 11 a 12/09) - prezentace výsledků studentům VŠ v mag. a Ph.D. studiu.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
JA - Electronics and optoelectronics
CEP - secondary branch
JE - Non-nuclear power engineering, energy consumption and utilization
CEP - another secondary branch
JO - Land transport systems and equipment
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20104 - Transport engineering<br>20201 - Electrical and electronic engineering<br>20704 - Energy and fuels
Completed project evaluation
Provider evaluation
V - Vynikající výsledky projektu (s mezinárodním významem atd.)
Project results evaluation
Achievements of the project: Measuring equipment to detect voltage unbalance and harmonic distortion based on virtual instrumentation. Verification of the actual impact of the electric railways on energy supply system in the Czech Republic and Russian Federation. The proposal to compensate the voltage unbalance with static filters. Final report with all results.
Solution timeline
Realization period - beginning
Jan 1, 2008
Realization period - end
Dec 31, 2010
Project status
U - Finished project
Latest support payment
Mar 1, 2010
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP11-MSM-ME-U/01:1
Data delivery date
Jun 30, 2011
Finance
Total approved costs
674 thou. CZK
Public financial support
492 thou. CZK
Other public sources
182 thou. CZK
Non public and foreign sources
0 thou. CZK