All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
ME09087

Research of Z-pinch plasma

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

    KONTAKT 7 (SMSM2009ME4)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    2060/2011-320

Alternative language

  • Project name in Czech

    Výzkum plazmatu rychlých Z-pinčů

  • Annotation in Czech

    Získání nových poznatků o vlastnostech energetických částic produkovaných výkonnými výbojovými zdroji se zaměřením na využití v jaderné energetice.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    BL - Plasma physics and discharge through gases

  • CEP - secondary branch

    BG - Nuclear, atomic and molecular physics, accelerators

  • CEP - another secondary branch

    JF - Nuclear energy

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10304 - Nuclear physics<br>10305 - Fluids and plasma physics (including surface physics)<br>20305 - Nuclear related engineering; (nuclear physics to be 1.3);

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    In the time of the solving of the four-year project the neutron production was studied on the discharge neutron sources and the condition of generation and characteristics of thermonuclear and non-thermal neutrons were formulated. The X-ray and corpuscular diagnostics were developed, tested and utilized at the participation of young scientists and students.

Solution timeline

  • Realization period - beginning

    Apr 1, 2009

  • Realization period - end

    Dec 31, 2012

  • Project status

    U - Finished project

  • Latest support payment

    Feb 23, 2012

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP13-MSM-ME-U/01:1

  • Data delivery date

    Jun 28, 2013

Finance

  • Total approved costs

    3,752 thou. CZK

  • Public financial support

    3,752 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK