All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
ME10042

Traffic Flow Management in Bottlenecks on Motorways and Dual Carriageways with the use of ITS

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

    KONTAKT 8 (SMSM2010ME5)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    2062/2011-320

Alternative language

  • Project name in Czech

    Řízení dopravního proudu v hrdlech na D a R pomocí ITS

  • Annotation in Czech

    Hlubší poznání dynamiky chování dopravních proudů v místech s omezenou průjezdní kapacitou vozovek a vytvoření mikrosimulačních modelů na základě kterých bude realizován automatizovaný expertní systém.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JO - Land transport systems and equipment

  • CEP - secondary branch

    IN - Informatics

  • CEP - another secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)<br>20104 - Transport engineering<br>20201 - Electrical and electronic engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Based on worldwide analysis the system architecture to influence the traffic flow in the "bottlenecks" was designed , included a detailed description of the system functionality and data flows in the functional and information architecture. Were also analyzed form and ethod of dissemination of information to drivers. Outputs have been registered within the Industrial Property Office.

Solution timeline

  • Realization period - beginning

    May 1, 2010

  • Realization period - end

    Aug 31, 2012

  • Project status

    U - Finished project

  • Latest support payment

    Feb 16, 2012

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP13-MSM-ME-U/01:1

  • Data delivery date

    Jun 28, 2013

Finance

  • Total approved costs

    1,500 thou. CZK

  • Public financial support

    1,500 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK