All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
ME10061

Development of calibration-free quantitative laser-induced breakdown spectroscopy (LIBS)

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

    KONTAKT 8 (SMSM2010ME5)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    2062/2011-320

Alternative language

  • Project name in Czech

    Vývoj metod bezkalibrační kvantitativní prvkové analýzy pomocí spektrometrie laserem indukovaného mikroplazmatu (CF-LIBS)

  • Annotation in Czech

    Společný vývoj bezkalibrační kvantitativní LIBS analýzy (CF-LIBS) vybraných vzorků. Aplikace postupu CF-LIBS nejenom v laboratorních podmínkách, ale i s využitím aparatury pro dálkovou LIBS (rLIBS).

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    BL - Plasma physics and discharge through gases

  • CEP - secondary branch

    CB - Analytical chemistry, separation

  • CEP - another secondary branch

    JR - Other machinery industry

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10305 - Fluids and plasma physics (including surface physics)<br>10406 - Analytical chemistry<br>20301 - Mechanical engineering

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The project contributed to further development of the analytical technique LIBS capable of qualitative and for selected elements also quantitative elemental real-time analysis with high spatial resolution in both laboratory and extralaboratory conditions. The results of the project were published in 3 papers and publicized in 25 presentations on international scientific conferences.

Solution timeline

  • Realization period - beginning

    May 1, 2010

  • Realization period - end

    Dec 31, 2012

  • Project status

    U - Finished project

  • Latest support payment

    Feb 16, 2012

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP13-MSM-ME-U/01:1

  • Data delivery date

    Jun 28, 2013

Finance

  • Total approved costs

    1,991 thou. CZK

  • Public financial support

    1,991 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK