All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
ME10083

Geochemistry and petrology of two-mica granites in the SW part of the Moldanubian (South Bohemian) Batholith.

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

    KONTAKT 8 (SMSM2010ME5)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    2062/2011-320

Alternative language

  • Project name in Czech

    Geochemie a petrologie dvoslídných granitů jihozápadní části moldanubického batolitu.

  • Annotation in Czech

    Řešením projektu bude vytvořena jednotná klasifikace dvojslídných granitů moldanubického batolitu, detailně charakterizováno jejich minerální a chemické složení, včetně složení a vývoje akcesorických minerálů a vytvořen nový petrogenetický model.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    DD - Geochemistry

  • CEP - secondary branch

    DB - Geology and mineralogy

  • CEP - another secondary branch

    DC - Seismology, volcanology and Earth structure

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10504 - Mineralogy<br>10505 - Geology<br>10506 - Paleontology<br>10507 - Volcanology

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The Mrákotín/Číměř granites were generated by dehydration melting of biotite at temperatures in the range 735-884°C, whereas the Deštná granite was generated by dehydration melting of muscovite at temperatures in range 622-760°C. Differences in the CaO/(FeO + MgO + Ti02) ratio between two-mica granite types of the IVloidanubian batholith indicate partly different original source of granite melt.

Solution timeline

  • Realization period - beginning

    May 1, 2010

  • Realization period - end

    Dec 31, 2012

  • Project status

    U - Finished project

  • Latest support payment

    Feb 16, 2012

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP13-MSM-ME-U/01:1

  • Data delivery date

    Jun 28, 2013

Finance

  • Total approved costs

    1,186 thou. CZK

  • Public financial support

    1,186 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK