All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Numerical modelling of coherent structures in space plasmas.

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

  • Main participants

  • Contest type

    M2 - International cooperation

  • Contract ID

    9113/2008-32

Alternative language

  • Project name in Czech

    Numerické modelování koherentních struktur v kosmickém plazmatu.

  • Annotation in Czech

    Cílem projektu je interpretace hkoherntních struktur pozorovaných v zemské magnetoobálce (magnetická minia, maxima afilamenty). K řešení tohoto problému použijeme dvou komplementárních přístupů:numerické simulace Vlasovovy rovnice hybridním kódem a současně numrické simulace Landauovským kódem vyvinutém v Nice.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    BL - Plasma physics and discharge through gases

  • CEP - secondary branch

    BN - Astronomy and celestial mechanics, astrophysics

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10305 - Fluids and plasma physics (including surface physics)<br>10308 - Astronomy (including astrophysics,space science)

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    We compared the nonlinear evolution of the mirror instability in simulations with asymptotic a quasilinear models (paper in Editors' Highlights). Simulations of Alfvén-wave filamentation exhibit a good agreement with theoretical predictions.

Solution timeline

  • Realization period - beginning

    Jan 1, 2008

  • Realization period - end

    Dec 31, 2008

  • Project status

    U - Finished project

  • Latest support payment

    Aug 7, 2008

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP09-MSM-ME-U/02:2

  • Data delivery date

    May 7, 2010

Finance

  • Total approved costs

    21 thou. CZK

  • Public financial support

    21 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK