All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Production of lactic acid bacteria minor non peptide metabolites with antimicrobial activity

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

  • Main participants

  • Contest type

    M2 - International cooperation

  • Contract ID

    6078/2008-32

Alternative language

  • Project name in Czech

    Production of lactic acid bacteria minor non peptide metabolites with antimicrobial activity

  • Annotation in Czech

    Publication of results in scientific refereed journals with attention to applies research: Food Control, Acta Alimentaria, Mlékařské listy. Presentations on scientific conferences, 2-2 PhD thesis work, diploma works Report for Ministry departmens

Scientific branches

  • R&D category

    NV - Nonindustrial research (Applied research excluded Industrial research)

  • CEP classification - main branch

    GM - Food industry

  • CEP - secondary branch

    EE - Microbiology, virology

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10606 - Microbiology<br>10607 - Virology<br>21101 - Food and beverages

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The sensitivity of chosen mould and yeast strains against minor metabolites (especially acetoin and mannitol) produced by lactic acid bacteria (LAB) was investigated. Furthermore, the effect of LAB minor metabolites on Caco-2 cells was proved.

Solution timeline

  • Realization period - beginning

    Jan 1, 2008

  • Realization period - end

    Dec 31, 2008

  • Project status

    U - Finished project

  • Latest support payment

    Aug 13, 2008

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP09-MSM-ME-U/02:2

  • Data delivery date

    May 7, 2010

Finance

  • Total approved costs

    69 thou. CZK

  • Public financial support

    69 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK