All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Prediction of water transport parameters of building materials from their microstructure

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

  • Main participants

  • Contest type

    M2 - International cooperation

  • Contract ID

    22829/2010-32

Alternative language

  • Project name in Czech

    Predikce transportních parametrů vlhkosti z jejich mikrostruktury

  • Annotation in Czech

    Vývoj experimentální a výpočetní metody pro určení permeability stavebních materiálů na základě jejich mikrostruktury.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JN - Civil engineering

  • CEP - secondary branch

    JI - Composite materials

  • CEP - another secondary branch

    JH - Ceramics, fire-proof materials and glass

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20101 - Civil engineering<br>20504 - Ceramics<br>20505 - Composites (including laminates, reinforced plastics, cermets, combined natural and synthetic fibre fabrics; filled composites)

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The relationship between microstructure of building materials and its transport properties was studied within the project. The dependence of moisture diffusion coefficient upon capillary pores volume was determined. The transport properties of fair-faceconcrete were studied as well.

Solution timeline

  • Realization period - beginning

    Jan 1, 2010

  • Realization period - end

    Dec 31, 2011

  • Project status

    U - Finished project

  • Latest support payment

    Mar 7, 2011

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP12-MSM-ME-U/01:1

  • Data delivery date

    Jul 12, 2012

Finance

  • Total approved costs

    134 thou. CZK

  • Public financial support

    134 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK