All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The Optimalization of Al and Mg Cast Alloys for Car and Aircraft Industry and Their Properties

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

  • Main participants

  • Contest type

    M2 - International cooperation

  • Contract ID

    1484/2009-32

Alternative language

  • Project name in Czech

    Optimalizace vlastností hliníkových a hořčíkových slitin na odlitky pro automobilový a letecký průmysl

  • Annotation in Czech

    Optimalizace vlastností vybraných hliníkových a hořčíkových slitin na odlitky pro automobilový a letecký průmysl. - systematická analýza vlivu technologických parametrů na strukturu, pórovitost a mechanické vlastnosti s důrazem na kvantifikování strukturních parametrů - definování souvislostí mezi strukturou a vlastnostmi v rozsahu potřebném pro predikci životnosti odlitků z těchto slitin.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JG - Metallurgy, metal materials

  • CEP - secondary branch

    JK - Corrosion and material surfaces

  • CEP - another secondary branch

    JL - Fatigue and fracture mechanics

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20306 - Audio engineering, reliability analysis<br>20501 - Materials engineering<br>20506 - Coating and films

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The analysis of the influence of technological parameters on the structure, porosity and mechanical properties was studied. Special attention was dedicated to quantifying the structural parameters and defining the relationship between structure and preperties for the prediction of life castings.

Solution timeline

  • Realization period - beginning

    Jan 1, 2008

  • Realization period - end

    Dec 31, 2009

  • Project status

    U - Finished project

  • Latest support payment

    Mar 9, 2009

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP10-MSM-ME-U/01:1

  • Data delivery date

    Jun 30, 2010

Finance

  • Total approved costs

    75 thou. CZK

  • Public financial support

    75 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK