All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Assurance of safe operation of dynamically loaded steel structures using acoustic emission detection

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

    KONTAKT 6 (SMSM2008ME3)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    9186/2008-32

Alternative language

  • Project name in Czech

    Zajištění bezpečného provozu dynamicky zatěžovaných ocelových konstrukcí snímáním akustické emise

  • Annotation in Czech

    Hlavním cílem projektu je zvýšení úrovně výzkumné činnosti v obou zúčastněných pracovištích a ekonomičtější využití zkušební techniky. Experimentálním cílem je prohloubení znalostí o chování dynamicky zatěžovaných materiálů a konstrukcí, zejména s využitím metody akustické emise.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JL - Fatigue and fracture mechanics

  • CEP - secondary branch

    JS - Reliability and quality management, industrial testing

  • CEP - another secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20306 - Audio engineering, reliability analysis

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project was focused on the utilization of AE method at diagnostics of technol. processes. The experience with AE applications at mech. tests of mater. and at diagnostics of rolling bearings were presented by our part.

Solution timeline

  • Realization period - beginning

    Jan 1, 2008

  • Realization period - end

    Dec 31, 2008

  • Project status

    U - Finished project

  • Latest support payment

    Oct 29, 2008

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP09-MSM-ME-U/02:2

  • Data delivery date

    May 7, 2010

Finance

  • Total approved costs

    80 thou. CZK

  • Public financial support

    80 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK