All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Deposition and characterization of nanostructured hard coatings with tailored optical properties

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

  • Main participants

  • Contest type

    M2 - International cooperation

  • Contract ID

    5725/2011-320

Alternative language

  • Project name in Czech

    Příprava a charakterizace nanostrukturních tvrdých vrstev s vyladěnými optickými vlastnostmi

  • Annotation in Czech

    Projekt poskytne lepší porozumění jevům spojených s barvením tvrdých povlaků pomocí nanostrukturních efektů. Povlaky budou připravovány pomocí PVD depozičních technik. Projekt povede k přípravě povlaků s výraznými barvami a výhodnými mechanickými vlastnostmi.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    BM - Solid-state physics and magnetism

  • CEP - secondary branch

    BL - Plasma physics and discharge through gases

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10302 - Condensed matter physics (including formerly solid state physics, supercond.)<br>10305 - Fluids and plasma physics (including surface physics)

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    This project is being realized in the framework of the MOBILITY Activity that aims primarily on establishing and strenghtening ties with foreign research institutions. The control of particular outputs is not implemented by the evalution committee, but the correctness of allocated finances and the adequacy of their use are checked.

Solution timeline

  • Realization period - beginning

    Jan 1, 2011

  • Realization period - end

    Dec 31, 2012

  • Project status

    U - Finished project

  • Latest support payment

    Feb 16, 2012

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP13-MSM-ME-U/01:1

  • Data delivery date

    Jun 28, 2013

Finance

  • Total approved costs

    110 thou. CZK

  • Public financial support

    110 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK