All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The study of low temperature carbon monoxide oxidation catalysts based on Pd-Pt-SnO(2-x)

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    KONTAKT

  • Call for proposals

  • Main participants

  • Contest type

    M2 - International cooperation

  • Contract ID

    18034/2010-32

Alternative language

  • Project name in Czech

    Studium nízkoteplotní oxidace kysličníku uhličitého na katalyzátorech Pd-Pt-SnO(2-x)

  • Annotation in Czech

    Cílem projektu je využití společného teoretického a experimentálního metodologického základu ve fyzice povrchů a v heterogenní katalýze ke studiu reaktivity binárních systémů a k návrhu nových multifunkčních materiálů.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    BM - Solid-state physics and magnetism

  • CEP - secondary branch

    CF - Physical chemistry and theoretical chemistry

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10302 - Condensed matter physics (including formerly solid state physics, supercond.)<br>10403 - Physical chemistry

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    We investigated growth of Pd on SnO2 surfaces using TEM and XPS. Experimental data were used as input data for ab initio calculations made in Argentina. The results showed formation of bimetallic alloy at the metal-oxide interface.

Solution timeline

  • Realization period - beginning

    Mar 1, 2010

  • Realization period - end

    Dec 31, 2011

  • Project status

    U - Finished project

  • Latest support payment

    Mar 10, 2011

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP12-MSM-ME-U/01:1

  • Data delivery date

    Jul 12, 2012

Finance

  • Total approved costs

    130 thou. CZK

  • Public financial support

    130 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK