All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The effect of normalization of blood glucose levels in pancreas graft recipients on advanced diabetic retinopathy

Public support

  • Provider

    Ministry of Health

  • Programme

    Programme to support medical applied research in 2015 to 2022

  • Call for proposals

    Zdravotnický AV 1 (SMZ0201501)

  • Main participants

    Institut klinické a experimentální medicíny

  • Contest type

    VS - Public tender

  • Contract ID

    15-26746A

Alternative language

  • Project name in Czech

    Vliv normalizace glykémií po transplantaci pankreatu na pokročilou formu diabetické retinopatie

  • Annotation in Czech

    Diabetická retinopatie (DR) je obávanou a častou komplikací, jež závisí na tíži a délce trvání hyperglykémie. Obnovení glukózové tolerance pomocí transplantace pankreatu může zpomalit její progresi. Experimentální data ukazují, že inhibice mammalian target of rapamycin (mTOR) tlumí proliferaci retinálních cév a rozvoj makulárního edému. Cílem projektu je testovat hypotézu, že systémová léčba mTOR inhibitorem everolimem, jenž je registrován jako imunosupresivní lék, zlepší průběh pokročilé DR po transplantaci. V prospektivní kontrolované nekomerční klinické studii bude 60 pacientů v konečném stádiu diabetické nefropatie na podkladě diabetu 1. typu, kteří podstupují kombinovanou transplantaci pankreatu a ledviny, randomizováno pro léčbu everolimem nebo mykofenolovou kyselinou jako doplňkem k léčbě tacrolimem. Po dobu 2 let budeme sledovat kompozitní oční ukazatel a řadu dílčích očních a metabolických parametrů. Výsledky publikované v impaktovaných transplantačních a diabetologických časopisech budou významné nejen pro transplantační medicínu ale také pro léčbu diabetu obecně.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    FJ - Surgery including transplantology

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    30212 - Surgery<br>30213 - Transplantation

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The research team achieved very satisfy results during resolution of the project “The effect of normalization of blood glucose levels in pancreas graft recipients on advanced diabetic retinopathy“, which had been accepted for supplementation by the AZV Ministry of health CR. The results can be useful for clinic daily praxis not only in a transplantology but even in other medical specializations. The group of examined patients had 46 objects originally, but for some technical and personal general state of health problems the final number of examining persons is 34. This number of patients were controlled during 24 months and statistical analysing was performed in it. The results are collected with a well arranged way in tables (6 all) situated in a final report. This trial means the first clinical randomised study in the world (according to WoS sources), when an impact of common kidney and pancreas transplantation on ophthalmologic functions was evaluated and next very important conditi

Solution timeline

  • Realization period - beginning

    May 1, 2015

  • Realization period - end

    Dec 31, 2019

  • Project status

    U - Finished project

  • Latest support payment

    Jun 28, 2018

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP20-MZ0-NV-U/03:1

  • Data delivery date

    Jul 1, 2020

Finance

  • Total approved costs

    8,904 thou. CZK

  • Public financial support

    8,904 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK