All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

New biotechnologies in prevention and treatment of biliary tract stenosis

Public support

  • Provider

    Ministry of Health

  • Programme

    Programme to support medical applied research in 2015 to 2022

  • Call for proposals

    Zdravotnický AV 1 (SMZ0201501)

  • Main participants

    Masarykova univerzita / Lékařská fakulta

  • Contest type

    VS - Public tender

  • Contract ID

    15-32484A

Alternative language

  • Project name in Czech

    Využití nových biotechnologií v prevenci a léčbě stenóz žlučových cest

  • Annotation in Czech

    Náplní projektu je na základě aplikovaného výzkumu na porcinním modelu ověřit účinnost nového designu biodegradabilního samoexpandibilního stentu v prevenci stenozy anastomozy na žlučových cestách. V druhé části ex vivo a následně in vivo testování nového prototypu balónového katetru - elektrody, prostřednictvím kterého bude možné provádět ablaci tkáně non termální metodou, tzv. ireverzibilní elektroporací.. Výstupem projektu budou impaktované publikace popisující výsledky srovnání hojení anastomoz s a bez užití protektivní biodegradabilní stentáže z hlediska krátkodobých i dlouhodobých komplikací a popis reakce jaterní tkáně a žlučových cest na ablaci sledování poškození vaskulárních struktur v okolí spolu se zhodnocením komplikací v časných i dlouhodobých. Plánem je využití této metodiky přímo v klinické praxi pro snížení morbidity a nákladů na léčbu pacientů s nutností léčby nedilatovaných žlučových cest (transplantace jater, resekce žlučových cest) a léčby maligních stenóz žlučových cest. Dalším výstupem je přihlášení užitného vzoru pro vyvíjený nástroj pro elektroporaci.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    FJ - Surgery including transplantology

  • CEP - secondary branch

    FP - Other medical fields

  • CEP - another secondary branch

    FS - Medical facilities, apparatus and equipment

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20601 - Medical engineering<br>20602 - Medical laboratory technology (including laboratory samples analysis; diagnostic technologies) (Biomaterials to be 2.9 [physical characteristics of living material as related to medical implants, devices, sensors])<br>30106 - Anatomy and morphology (plant science to be 1.6)<br>30107 - Medicinal chemistry<br>30108 - Toxicology<br>30109 - Pathology<br>30212 - Surgery<br>30213 - Transplantation<br>30221 - Critical care medicine and Emergency medicine<br>30223 - Anaesthesiology<br>30224 - Radiology, nuclear medicine and medical imaging<br>30225 - Allergy<br>30226 - Rheumatology<br>30227 - Geriatrics and gerontology<br>30229 - Integrative and complementary medicine (alternative practice systems)<br>30230 - Other clinical medicine subjects<br>30307 - Nursing<br>30308 - Nutrition, Dietetics<br>30309 - Tropical medicine<br>30310 - Parasitology<br>30311 - Medical ethics<br>30312 - Substance abuse<br>30501 - Forensic science<br>30502 - Other medical science

Completed project evaluation

  • Provider evaluation

    O - Nesplněno zadání, smlouva však byla dodržena

  • Project results evaluation

    The project resolved duodenum sparing technique of bio-degradable stent implantation into intrahepatic anastomosis.The project also delivered a tool to dilatation of intrahepatic space in patients with tumours. The average methods and phasing of the project was accomplished according to proposal. The outputs of the project are insufficient compared to costs.

Solution timeline

  • Realization period - beginning

    May 1, 2015

  • Realization period - end

    Dec 31, 2018

  • Project status

    U - Finished project

  • Latest support payment

    Jun 28, 2018

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP19-MZ0-NV-U/01:1

  • Data delivery date

    Jun 28, 2019

Finance

  • Total approved costs

    16,999 thou. CZK

  • Public financial support

    16,999 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK