All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The interplay between the gut microbiota and brain functions: implication for metabolome and metabolic syndrome in schizophrenia

Public support

  • Provider

    Ministry of Health

  • Programme

    Programme to support medical applied research in 2015 to 2022

  • Call for proposals

    Zdravotnický AV 3 (SMZ0201701)

  • Main participants

    Národní ústav duševního zdraví

  • Contest type

    VS - Public tender

  • Contract ID

    17-31852A

Alternative language

  • Project name in Czech

    Vztahy mezi střevní mikrobiotou a mozkovými funkcemi: implikace pro metabolom a metabolický syndrom u schizofrenie

  • Annotation in Czech

    Schizofrenie (SCZ) významně ovlivňuje kvalitu života pacientů. Nová antipsychotika terapii zkvalitňují, ale u řady pacientů je medikace spojena s rozvojem metabolického syndromu, včetně výrazné obezity. Jak metabolický syndrom, tak schizofrenie jsou nyní spojovány s poruchou metabolismu, změnami střevní mikroflóry, selháním střevní bariéry a mírným chronickým zánětem. A právě analýzou těchto mechanismů by mohlo být možné najít biomarkery vhodné pro identifikaci pacientů se zvýšeným rizikem výskytu nežádoucích účinků terapie.Odběr materiálu (krev, moč a stolice) a hodnocení sledovaných údajů bude probíhat opakovaně, na začátku léčby a po několika měsících, kdy již bude patrné, zda se metabolický syndrom rozvinul. Navržený projekt posune znalosti o úloze mikrobiomu a metabolomu v predikci rozvoje metabolického syndromu, indukovaného antipsychotiky u první epizody schizofrenie, a mohl by být nástrojem pro zkvalitnění diagnostických a terapeutických metod. Pokusy na zvířecím modelu SCZ budou simulovat klinickou situaci detailní analýzou sledovaných parametrů.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    FL - Psychiatry, sexology

  • CEP - secondary branch

    FH - Neurology, neuro-surgery, nuero-sciences

  • CEP - another secondary branch

    FE - Other fields of internal medicine

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    30103 - Neurosciences (including psychophysiology)<br>30210 - Clinical neurology<br>30215 - Psychiatry<br>30217 - Urology and nephrology<br>30218 - General and internal medicine<br>30219 - Gastroenterology and hepatology<br>30220 - Andrology <br>30301 - Social biomedical sciences (includes family planning, sexual health, psycho-oncology, political and social effects of biomedical research)

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    1. The aim of the project was to evaluate the influence of the microbiome on the development of metabolic syndrome in patients with schizophrenia and antipsychotic treatment and to identify predictive biomarkers. A yet unpublished work shows a difference in the bacteriome of patients with first-episode schizophrenia and controls, in eating habits and metabolic parameters, but not in relation to antipsychotic treatment. A so far unpublished animal study describes changes in metabolic pathways during the early administration of lipopolysaccharide, which may contribute to the development of schizophrenia. 2. Most of the relevant results are not yet published (under review,submitted). 3. The project is important for an interdisciplinary approach and an emphasis on environmental influences. 4. The results point to changes in the composition of the microbiome already at the first manifestation of schizophrenia, both at the level of alpha and beta diversity. However, they will not bring a dir

Solution timeline

  • Realization period - beginning

    Apr 1, 2017

  • Realization period - end

    Jun 30, 2022

  • Project status

    U - Finished project

  • Latest support payment

    Apr 26, 2021

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP23-MZ0-NV-U

  • Data delivery date

    Jan 19, 2023

Finance

  • Total approved costs

    13,715 thou. CZK

  • Public financial support

    13,057 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    638 thou. CZK