All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
OC 190

Fire safe connections

Project goals

production of analytical design model of connection behaviour under enhanced temperature condition

Keywords

Fire save connectionproduction of analytical design modelconnection behaviourenhanced temperature condition

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    COST

  • Call for proposals

    COST 5 (SMSM2007OC2)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    1143/2010-32

Alternative language

  • Project name in Czech

    POŽÁRNĚ ODOLNÉ STYČNÍKY

  • Annotation in Czech

    vypracování analytického návrhového modelu chování styčníku za zvýšené teploty

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JN - Civil engineering

  • CEP - secondary branch

  • CEP - another secondary branch

  • 20101 - Civil engineering

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    In the project was for composite steel to concrete structures developed the beam to column and beam to beam connection with improved fire resistance. The behaviour and the accuracy of the prediction model was optimised by the finite element modelling .

Solution timeline

  • Realization period - beginning

    Jan 1, 2007

  • Realization period - end

    Dec 31, 2010

  • Project status

    U - Finished project

  • Latest support payment

    Mar 1, 2010

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP11-MSM-OC-U/01:1

  • Data delivery date

    Jun 30, 2011

Finance

  • Total approved costs

    1,485 thou. CZK

  • Public financial support

    1,485 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK

Recognised costs

1 485 CZK thou.

Public support

1 485 CZK thou.

0%


Provider

Ministry of Education, Youth and Sports

CEP

JN - Civil engineering

Solution period

01. 01. 2007 - 31. 12. 2010