Fire safe connections
Project goals
production of analytical design model of connection behaviour under enhanced temperature condition
Keywords
Fire save connectionproduction of analytical design modelconnection behaviourenhanced temperature condition
Public support
Provider
Ministry of Education, Youth and Sports
Programme
COST
Call for proposals
COST 5 (SMSM2007OC2)
Main participants
—
Contest type
VS - Public tender
Contract ID
1143/2010-32
Alternative language
Project name in Czech
POŽÁRNĚ ODOLNÉ STYČNÍKY
Annotation in Czech
vypracování analytického návrhového modelu chování styčníku za zvýšené teploty
Scientific branches
Completed project evaluation
Provider evaluation
V - Vynikající výsledky projektu (s mezinárodním významem atd.)
Project results evaluation
In the project was for composite steel to concrete structures developed the beam to column and beam to beam connection with improved fire resistance. The behaviour and the accuracy of the prediction model was optimised by the finite element modelling .
Solution timeline
Realization period - beginning
Jan 1, 2007
Realization period - end
Dec 31, 2010
Project status
U - Finished project
Latest support payment
Mar 1, 2010
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP11-MSM-OC-U/01:1
Data delivery date
Jun 30, 2011
Finance
Total approved costs
1,485 thou. CZK
Public financial support
1,485 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK
Recognised costs
1 485 CZK thou.
Public support
1 485 CZK thou.
0%
Provider
Ministry of Education, Youth and Sports
CEP
JN - Civil engineering
Solution period
01. 01. 2007 - 31. 12. 2010