The design of the deposition apparatus for plasma polymerization processes
Public support
Provider
Ministry of Education, Youth and Sports
Programme
COST
Call for proposals
COST 1 (SMSM200132004)
Main participants
VAKUUM PRAHA, spol. s r.o.
Contest type
VS - Public tender
Contract ID
—
Alternative language
Project name in Czech
Návrh depoziční aparatury pro plazmově polymerizační procesy
Annotation in Czech
Návrh depoziční aparatury a jejích vakuových komponent pro plazmově polymerizační procesy
Scientific branches
R&D category
NV - Nonindustrial research (Applied research excluded Industrial research)
CEP classification - main branch
BL - Plasma physics and discharge through gases
CEP - secondary branch
JJ - Other materials
CEP - another secondary branch
JK - Corrosion and material surfaces
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10305 - Fluids and plasma physics (including surface physics)<br>20502 - Paper and wood<br>20503 - Textiles; including synthetic dyes, colours, fibres (nanoscale materials to be 2.10; biomaterials to be 2.9)<br>20506 - Coating and films<br>21001 - Nano-materials (production and properties)<br>21002 - Nano-processes (applications on nano-scale); (biomaterials to be 2.9)
Completed project evaluation
Provider evaluation
V - Vynikající výsledky projektu (s mezinárodním významem atd.)
Project results evaluation
The modular deposition apparatus for plasma polymerisation processes has been designed. Also vacuum systems for sampling, sample transport and analysis have been realised. Publications: 2 scientific journals, 9 conference proceedings
Solution timeline
Realization period - beginning
Jan 1, 2000
Realization period - end
Jan 1, 2005
Project status
U - Finished project
Latest support payment
—
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP06-MSM-OC-U/04:2
Data delivery date
May 28, 2008
Finance
Total approved costs
4,051 thou. CZK
Public financial support
2,020 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
2,031 thou. CZK