All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The design of the deposition apparatus for plasma polymerization processes

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    COST

  • Call for proposals

    COST 1 (SMSM200132004)

  • Main participants

    VAKUUM PRAHA, spol. s r.o.

  • Contest type

    VS - Public tender

  • Contract ID

Alternative language

  • Project name in Czech

    Návrh depoziční aparatury pro plazmově polymerizační procesy

  • Annotation in Czech

    Návrh depoziční aparatury a jejích vakuových komponent pro plazmově polymerizační procesy

Scientific branches

  • R&D category

    NV - Nonindustrial research (Applied research excluded Industrial research)

  • CEP classification - main branch

    BL - Plasma physics and discharge through gases

  • CEP - secondary branch

    JJ - Other materials

  • CEP - another secondary branch

    JK - Corrosion and material surfaces

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10305 - Fluids and plasma physics (including surface physics)<br>20502 - Paper and wood<br>20503 - Textiles; including synthetic dyes, colours, fibres (nanoscale materials to be 2.10; biomaterials to be 2.9)<br>20506 - Coating and films<br>21001 - Nano-materials (production and properties)<br>21002 - Nano-processes (applications on nano-scale); (biomaterials to be 2.9)

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The modular deposition apparatus for plasma polymerisation processes has been designed. Also vacuum systems for sampling, sample transport and analysis have been realised. Publications: 2 scientific journals, 9 conference proceedings

Solution timeline

  • Realization period - beginning

    Jan 1, 2000

  • Realization period - end

    Jan 1, 2005

  • Project status

    U - Finished project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP06-MSM-OC-U/04:2

  • Data delivery date

    May 28, 2008

Finance

  • Total approved costs

    4,051 thou. CZK

  • Public financial support

    2,020 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    2,031 thou. CZK