Nanoscopic ferroelectrics and their spectroscopic characterization 2
Public support
Provider
Ministry of Education, Youth and Sports
Programme
COST
Call for proposals
COST 7 (SMSM2009OC4)
Main participants
—
Contest type
VS - Public tender
Contract ID
1682/2009-32
Alternative language
Project name in Czech
Nanoskopická feroelektrika a jejich spektroskopická charakterizace 2
Annotation in Czech
1. Vysvětlení mikroskopické příčiny zmenšené dielektrické odezvy ve vrstvách a keramikách v porovnání s monokrystaly materiálů s vysokou permitivitou. 2. Vývoj a optimalizace přípravy feroelektrických prášků a nanokompozitních materiálů.
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
BM - Solid-state physics and magnetism
CEP - secondary branch
JJ - Other materials
CEP - another secondary branch
JI - Composite materials
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10302 - Condensed matter physics (including formerly solid state physics, supercond.)<br>20502 - Paper and wood<br>20503 - Textiles; including synthetic dyes, colours, fibres (nanoscale materials to be 2.10; biomaterials to be 2.9)<br>20505 - Composites (including laminates, reinforced plastics, cermets, combined natural and synthetic fibre fabrics; filled composites)<br>21001 - Nano-materials (production and properties)<br>21002 - Nano-processes (applications on nano-scale); (biomaterials to be 2.9)
Completed project evaluation
Provider evaluation
V - Vynikající výsledky projektu (s mezinárodním významem atd.)
Project results evaluation
Nanocrystalline powders, ceramics and composiites were prepared and characterizzed. Significant results were achieved by the spectroscopic study of nanoscopic materials. The results were published in 10 papars and presented in conferences and workshops of Action COST 539.
Solution timeline
Realization period - beginning
Apr 1, 2009
Realization period - end
Dec 31, 2009
Project status
U - Finished project
Latest support payment
Apr 22, 2009
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP10-MSM-OC-U/02:2
Data delivery date
Jun 30, 2011
Finance
Total approved costs
250 thou. CZK
Public financial support
250 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK