All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
OC10007

Electronic transport in III-N-V compounds nanostructures

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    COST

  • Call for proposals

    COST 8 (SMSM2010OC5)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    1081/2011-320

Alternative language

  • Project name in Czech

    Elektronový transport v nanostrukturách sloučenin III-N-V

  • Annotation in Czech

    Cílem projektu v rámci koordinované Akce COST MP0805 bude provádět teoretický výzkum relaxačních jevů, transportu a vlivu interakce nosičů s kmity mříže nanostruktur typu III-N-V.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    BM - Solid-state physics and magnetism

  • CEP - secondary branch

    JA - Electronics and optoelectronics

  • CEP - another secondary branch

    CF - Physical chemistry and theoretical chemistry

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10302 - Condensed matter physics (including formerly solid state physics, supercond.)<br>10403 - Physical chemistry<br>20201 - Electrical and electronic engineering

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The process of the power-law time dependence of the photoluminiscence intensity decay in small quantum dots with the indirect gap was explained on the basis of the electronic interaction with longitudinal optical phonons. The process of energy transfer in the hybrid organic-inorganic donor- acceptor system was found as to be formed simultaneously by the non-resonant and resonant vibronic parts

Solution timeline

  • Realization period - beginning

    May 1, 2010

  • Realization period - end

    Dec 31, 2012

  • Project status

    U - Finished project

  • Latest support payment

    Feb 27, 2012

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP13-MSM-OC-U/01:1

  • Data delivery date

    Jun 28, 2013

Finance

  • Total approved costs

    1,500 thou. CZK

  • Public financial support

    1,500 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK