All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
OE 204

Control systém and adaptation of combustion engine

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    EUREKA - European co-operation in the sphere of applied and industrial research and development aimed at the support of multinational co-operation among industrial undertakings, research institutes and universities

  • Call for proposals

    EUREKA 4 (SMSM200600OE1)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    2900/2006-32

Alternative language

  • Project name in Czech

    Vývoj řídicího systému a úpravy spalovacího motoru zvyšující výkon při minimalizaci exhalací a jiskrovou bezpečnost pro použití v důlním prostředí

  • Annotation in Czech

    Vývoj řídícího systému vznětového motoru o výkonu 100kW s obsahem max. 750 ppm Nox ve spalinách a to úpravou běžného motoru

Scientific branches

  • R&D category

    NV - Nonindustrial research (Applied research excluded Industrial research)

  • CEP classification - main branch

    DH - Mining industry including coal mining and processing

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20701 - Environmental and geological engineering, geotechnics<br>20702 - Petroleum engineering (fuel, oils)<br>20703 - Mining and mineral processing

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    Completed prototype of pedant engine inside the mining locomotive. The locomotive was tested and certificated.

Solution timeline

  • Realization period - beginning

    Mar 1, 2006

  • Realization period - end

    Dec 31, 2008

  • Project status

    U - Finished project

  • Latest support payment

    Feb 26, 2008

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP09-MSM-OE-U/01:1

  • Data delivery date

    Jun 25, 2009

Finance

  • Total approved costs

    17,200 thou. CZK

  • Public financial support

    8,593 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    8,607 thou. CZK