Computerized Measuring System for Analysis of Chosen Characteristics and Processes in Porous Environment by EIS Method
Public support
Provider
Ministry of Education, Youth and Sports
Programme
EUREKA - European co-operation in the sphere of applied and industrial research and development aimed at the support of multinational co-operation among industrial undertakings, research institutes and universities
Call for proposals
EUREKA 8 (SMSM2010OE5)
Main participants
—
Contest type
VS - Public tender
Contract ID
1826/2011-320
Alternative language
Project name in Czech
Automatizovaný systém pro analýzu vybraných charakteristik a procesů v porézním prostředí metodou EIS
Annotation in Czech
Projekt řeší aparaturu pro měření elektrické impedance porézního prostředí v sadě s volitelným počtem měřicích míst (1, 8, 16, 32, 64) navazující na koncepci 128 kanálového Z-metru (E!3838). Přispěje objasnění složitého proudění vody tímto prostředím.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
JN - Civil engineering
CEP - secondary branch
JB - Sensors, detecting elements, measurement and regulation
CEP - another secondary branch
BK - Liquid mechanics
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10305 - Fluids and plasma physics (including surface physics)<br>20101 - Civil engineering<br>20201 - Electrical and electronic engineering
Completed project evaluation
Provider evaluation
V - Vynikající výsledky projektu (s mezinárodním významem atd.)
Project results evaluation
Made 9 pc innovated Z-meter III (size and weight suitable for field measurements) with a capacity of 1, 8, 16, 32, 64 and 128 measuring points usable according to the needs of practice. Achieved of higher technical level, above planned - adapter, calibrator. Results published in the proceedings of EUREKA 2010-12 under the ISBN, listed on INNOVATION 2012 Prague and the EU Project Day, Brussel.
Solution timeline
Realization period - beginning
May 1, 2010
Realization period - end
Dec 31, 2012
Project status
U - Finished project
Latest support payment
Aug 12, 2012
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP13-MSM-OE-U/02:2
Data delivery date
Feb 21, 2014
Finance
Total approved costs
18,001 thou. CZK
Public financial support
9,000 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
9,001 thou. CZK