*IFF SYSTEMS - IFF systems including antenna unit with electronic scan
Project goals
*The aim of the project is to create feasibility study of the IFF identification modular system including antenna unit with electronic scan.This study will enable implementation of different levels of IFF identification system including antenna unit withelectronic scan. The implementation could be realized both in the ground forces and in the air forces.The IFF identification modular system including antenna unit with electronic scan will stem from current results of IDEBOT project. The conclusions ofIDEBOT project, concerning transponder and interrogator, will be fully used and evolved in IFF SYSTEMSThe feasibility study will be elaborated in the end of 2006 and the project will be ready to the development stage.
Keywords
feasibility studyIFF identificationmodular systemantenna unit with electronic scantransponderinterrogator
Public support
Provider
Ministry of Defence
Programme
Professionalisation of the Armed Forces or the Czech Republic
Call for proposals
Profesionalizace AČR 1 (SMO0200595001)
Main participants
—
Contest type
VS - Public tender
Contract ID
—
Alternative language
Project name in Czech
*SYSTÉMY IFF - Systémy IFF s anténním systémem s elektronickým scanováním
Annotation in Czech
*Cílem projektu je vytvoření projektové studie modulárního stavebnicového systému identifikace IFF s anténou s elektronickým scanováním a to jak pro aplikaci v rámci pozemních sil, tak i v rámci leteckých sil.Modulární stavebnice systému identifikace IFFs anténou s elektronickým scanováním bude vycházet z aktuálních výsledků projektu IDEBOT,jenž bude plně využívat, implementovat a dále rozvíjet a který se zaměřuje na systémy dotazovače a odpovídače, které bosahují růstový potenciál pro implementaci technologií identifikace IFF s anténou s elektronickým scanováním.Na konci roku 2006 bude vypracována projektová studie a projekt bude připraven k vývojové fázi.
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
JW - Navigation, connection, detection and countermeasure
CEP - secondary branch
KA - Militarism
CEP - another secondary branch
—
20202 - Communication engineering and systems
20203 - Telecommunications
21100 - Other engineering and technologies
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Results from solving the project are following: 1 publication and 1 authenticated technology. The project solved within the meaning of the submissions aims.
Solution timeline
Realization period - beginning
Jan 1, 2006
Realization period - end
Jan 1, 2006
Project status
U - Finished project
Latest support payment
—
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP07-MO0-OP-U/01:1
Data delivery date
Jun 18, 2007
Finance
Total approved costs
1,500 thou. CZK
Public financial support
750 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
750 thou. CZK
Basic information
Recognised costs
1 500 CZK thou.
Public support
750 CZK thou.
50%
Provider
Ministry of Defence
CEP
JW - Navigation, connection, detection and countermeasure
Solution period
01. 01. 2006 - 01. 01. 2006