All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

ACTIVE PROTECTON - Research of ballistic active protection system

Project goals

Main aim of this project is theoretical research in area of armoured military vehicle active protection systems, and experimental verification of their ability to destroy or decrease of residual effect of the threat on armoured military vehicles (long-rod projectiles, CE warheads).System in solution will detect, destroy or decrease penetration ability of anti-tank ammunition, which threats MBTś. The aim of the project is also active protection system for lightweight armoured military vehicles (with baseballistic protection according to STANAG 4569, level 3) against RPG. Anti tank weapons are meaning long-rod projectiles (APFSDS) and missiles with shaped-charge warhead like RPG-7, ATGM (Anti Tank Guided Missile). Project covers also experimental verification of suggested solution.

Keywords

Active protection

Public support

  • Provider

    Ministry of Defence

  • Programme

  • Call for proposals

  • Main participants

  • Contest type

    VZ - Public procurement

  • Contract ID

    0701 7 6120

Alternative language

  • Project name in Czech

    AKTIVNÍ OCHRANA - Výzkum systému aktivní balistické ochrany vojenské techniky

  • Annotation in Czech

    Cílem projektu je teoretický výzkum systémů aktivní ochrany vojenské obrněné techniky a experimentální ověření jeho schopnosti zničit anebo podstatně snížit účinky prostředků ohrožujících obrněnou techniku (podkaliberní projektily a střely s kumulativníhlavicí). Řešený systém bude detekovat, zneškodňovat nebo podstatně snižovat účinky PT prostředků ohrožujících těžkou obrněnou bojovou techniku. Systém bude řešit i ochranu lehce pancéřovaných vozidel (se základní balistickou ochranou dle STANAG 4569, stupeň ochrany 3) před RPG střelami. PT prostředky rozumíme projektily působící kinetickou energií (KE) jako jsou podkaliberní projektily (APFSDS) a dále střely s kumulativní hlavicí (CE), např. RPG-7 či PTŘS. Součástí projektu je experimentální ověření účinnosti navrženého řešení.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    KA - Militarism

  • CEP - secondary branch

    JY - Firearms, ammunition, explosives, combat vehicles

  • CEP - another secondary branch

    JW - Navigation, connection, detection and countermeasure

  • 20202 - Communication engineering and systems
    20203 - Telecommunications
    21100 - Other engineering and technologies

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The design and verification: 1.The light variant of APS for light and medium armoured vehicles against anti-tank missiles with a shaped-charge warhead-RPG and ATGM. 2.The heavy variant of APS with the ability to decrease of the effects of long-rod projectile EPpSv-97. The proposed system proved high efficiency on the present military technology - armoured personnel carrier OT-64 and tank T-72M1.

Solution timeline

  • Realization period - beginning

    Apr 1, 2007

  • Realization period - end

    Dec 31, 2009

  • Project status

    U - Finished project

  • Latest support payment

    Feb 27, 2009

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP10-MO0-OS-U/02:2

  • Data delivery date

    Jun 29, 2010

Finance

  • Total approved costs

    33,451 thou. CZK

  • Public financial support

    33,451 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK

Recognised costs

33 451 CZK thou.

Public support

33 451 CZK thou.

0%


Provider

Ministry of Defence

CEP

KA - Militarism

Solution period

01. 04. 2007 - 31. 12. 2009