All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Acquisition system cooperating with MBK and UAV systems – KOPR

Project goals

The aim of the project is to develop, verify and introduce with the Czech Army a prototype of a modular „Acquisition system cooperating with MBK and UAV systems – KOPR” comprising two main modules stacKOPR and detKOPR that will be capable of intercommunication providing accu-rate target acquisition, cooperation with the Czech Army C4ISTAR reconnaissance means, intelligence systems and unmanned observation systems introduced in the Czech Army (UAS, UGS).

Keywords

reconnaissance meanstarget acquisition

Public support

  • Provider

    Ministry of Defence

  • Programme

  • Call for proposals

  • Main participants

    Vojenský technický ústav, s.p. / lokalita Slavičín

  • Contest type

    VZ - Public procurement

  • Contract ID

    1801 2 8580

Alternative language

  • Project name in Czech

    KOPR – kooperující akviziční systém s komplety MBK a UAV

  • Annotation in Czech

    Cílem projektu je vyvinout, ověřit a do používání v AČR zavést prototyp modulárního „Kooperujícího akvizičního systému s komplety MBK a UAV – KOPR“, sestávající se ze dvou základních dílčích modulů stacKOPR a detKOPR, které budou schopny vzájemné kooperace pro přesnou akvizici cíle, kooperace s průzkumnými prostředky C4ISTAR AČR, komplety zpravodajství a v AČR zavedenými bezosádkovými průzkumnými prostředky (UAS, UGS).

Scientific branches

  • R&D category

    VV - Exeperimental development

  • OECD FORD - main branch

    20201 - Electrical and electronic engineering

  • OECD FORD - secondary branch

  • OECD FORD - another secondary branch

  • JA - Electronics and optoelectronics
    JB - Sensors, detecting elements, measurement and regulation

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The aim of the project has been fully completed. The main output of the KOPR project is the prototype that is in complete compliance with the requested requirements (verified by prescribed trials).

Solution timeline

  • Realization period - beginning

    Sep 25, 2018

  • Realization period - end

    Oct 30, 2021

  • Project status

    U - Finished project

  • Latest support payment

    Feb 22, 2021

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP22-MO0-OW-U

  • Data delivery date

    Aug 2, 2022

Finance

  • Total approved costs

    74,029 thou. CZK

  • Public financial support

    74,029 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK

Basic information

Recognised costs

74 029 CZK thou.

Public support

74 029 CZK thou.

100%


Provider

Ministry of Defence

OECD FORD

Electrical and electronic engineering

Solution period

25. 09. 2018 - 30. 10. 2021