DENPL - Replacement devices for highly sensitive detection NPA GSA-12
Public support
Provider
Ministry of Defence
Programme
—
Call for proposals
—
Main participants
Vojenský výzkumný ústav, s.p.
Contest type
VZ - Public procurement
Contract ID
1601 2 1930
Alternative language
Project name in Czech
DENPL - Náhrada přístroje pro vysoce citlivou detekci NPL GSA-12
Annotation in Czech
Hlavním cílem řešení projektu je návrh, výroba a otestování funkčního vzorku citlivého detektoru NPL na principu biochemické reakce, který perspektivně plně nahradí konstrukčně zastaralý detektor ruské výroby GSA-12. Budou tak vytvořeny podmínky pro následný vývoj detekčního přístroje.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
KA - Militarism
CEP - secondary branch
CB - Analytical chemistry, separation
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10406 - Analytical chemistry<br>21100 - Other engineering and technologies
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The result of the project is a study of the possibility of detector construction, which will ensure highly sensitive detection of cholinesterase inhibiting substances. Within the framework of the DENPL project, various variants of the ChE detection system (AChE and BChE variants) / indicator were tested. These variants were subsequently verified using two detection systems. The results achieved confirmed the proposed procedures and principles chosen for their own work. In addition to the detection parameters achieved, it has been shown that it is possible to construct this detector to allow automatic operation with minimal operator effort and to allow such a detector to be connected to an automated chemical exploration and observation system.
Solution timeline
Realization period - beginning
Jun 1, 2016
Realization period - end
Dec 31, 2018
Project status
U - Finished project
Latest support payment
Mar 14, 2018
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP19-MO0-OW-U/01:1
Data delivery date
Jun 19, 2019
Finance
Total approved costs
8,087 thou. CZK
Public financial support
8,087 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK