MOVPD
Public support
Provider
Ministry of Defence
Programme
—
Call for proposals
—
Main participants
České vysoké učení technické v Praze / Fakulta stavební
Contest type
VZ - Public procurement
Contract ID
2301 5 3530
Alternative language
Project name in Czech
MOVPD - Stanovení technologie a metodiky rychlých oprav dráhy/RWY po napadení protizemní konvenční taktickou municí včetně posouzení dostupných prostředků a materiálů
Annotation in Czech
Stanovení vhodné technologie a metodiky rychlých oprav RWY po napadení protizemní konvenční taktickou municí a prověření dostupných materiálů i vlastních prostředků k opravě RWY včetně návrhu dosažení schopnosti opravy organickou jednotkou Praporu podpory Vzdušných sil (dále jen „prp VzS“) a příslušníky aktivních záloh.
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
20102 - Construction engineering, Municipal and structural engineering
OECD FORD - secondary branch
—
OECD FORD - another secondary branch
—
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
GB - Agricultural machines and construction<br>JM - Structural engineering
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The MOVPD project addressed the critical need to increase the resilience of airports and the Czech Armed Forces ability to carry out rapid repairs to runways (RWY) following an attack with conventional munitions, which is key to maintaining the country’s defense capabilities. The project evaluated the effects of conventional ground-attack tactical munitions on various airport surface compositions depending on the geological subsoil, using numerical simulations. The resulting study of material and technical/technological capabilities, as well as available existing industrial technical solutions, laid the groundwork for meeting the current and future needs of the Czech Armed Forces. The project also resulted in proposals for specific measures to repair airport surfaces based on standard conditions, the extent of damage, the type of structure, and the subsoil, including requirements for equipment and training.
Solution timeline
Realization period - beginning
Mar 14, 2023
Realization period - end
Dec 31, 2025
Project status
U - Finished project
Latest support payment
Jan 31, 2024
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP26-MO0-OY-U
Data delivery date
Jul 8, 2026
Finance
Total approved costs
9,942 thou. CZK
Public financial support
9,942 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK