All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Optimization of process designing technical erosion control measures

Public support

  • Provider

    Ministry of Agriculture

  • Programme

    Research in the agricultural complex (RAC)

  • Call for proposals

    VaV pro zemědělský sektor II 1 (SMZE2009MZE02)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    14575/2009 - 18020

Alternative language

  • Project name in Czech

    Optimalizace postupu navrhování technických protierozních opatření

  • Annotation in Czech

    Získání podkladů pro optimální navrhování technických PEO v zájmu snížení ztrát půdy erozí, množství splavenin a povrchového odtoku. Vypracování prakticky aplikovatelných postupů a doporučení zaměřených na volbu vhodných a efektivních typů TPEO.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    DO - Protection of landscape

  • CEP - secondary branch

    JM - Structural engineering

  • CEP - another secondary branch

    DF - Pedology

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10511 - Environmental sciences (social aspects to be 5.7)<br>20102 - Construction engineering, Municipal and structural engineering<br>40104 - Soil science

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project progress and results comply with the contract. The purpose of the project was to obtain a basis for optimum designing of technical PEO for the purpose of reduction of soil loss by erosion and surface wash off, preparation of practically applicable procedures and recommendations focused on selection of suitable and effective types of TPEO. The purpose was accomplished.

Solution timeline

  • Realization period - beginning

    Jun 1, 2009

  • Realization period - end

    Dec 31, 2013

  • Project status

    U - Finished project

  • Latest support payment

    Sep 12, 2013

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP14-MZE-QI-U/01:1

  • Data delivery date

    Jun 26, 2014

Finance

  • Total approved costs

    9,041 thou. CZK

  • Public financial support

    8,081 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    960 thou. CZK