All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Optimization of farm vermicomposting technology

Public support

  • Provider

    Ministry of Agriculture

  • Programme

    Research in the agricultural complex (RAC)

  • Call for proposals

    VaV pro zemědělský sektor II 1 (SMZE2009MZE02)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    14579/2009 - 18020

Alternative language

  • Project name in Czech

    Optimalizace technologie faremního vermikompostování

  • Annotation in Czech

    Kriticky zhodnotit vliv vermikompostů, vyrobených na bázi různého surovinového složení a produkovaných odlišnými technologiemi, na zlepšení kvalitativních parametrů půdy.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    DM - Solid waste and its control, recycling

  • CEP - secondary branch

    GD - Fertilization, irrigation, soil treatment

  • CEP - another secondary branch

    GB - Agricultural machines and construction

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10511 - Environmental sciences (social aspects to be 5.7)<br>20102 - Construction engineering, Municipal and structural engineering<br>20302 - Applied mechanics<br>40101 - Agriculture

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Actual indicators of the project objective achievement include design and testing of an effective vermin reactor for obtaining quality vermin compost and verification of application of vermin composts with different raw material composition and production technologies with regard to soil and crop quality parameters.

Solution timeline

  • Realization period - beginning

    Jun 1, 2009

  • Realization period - end

    Dec 31, 2013

  • Project status

    U - Finished project

  • Latest support payment

    Mar 29, 2013

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP14-MZE-QI-U/01:1

  • Data delivery date

    Jun 26, 2014

Finance

  • Total approved costs

    6,562 thou. CZK

  • Public financial support

    6,562 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK